The March MDBF's have just come out, and the results are again somewhat odd, in a way. MDBF increased slightly on the M3's, increased considerably on the DE's and DM's, but decreased with the members of the M7 and C3 fleet:
Equip-
ment |
Fleet
Size
|
Goal MDBF
|
January Failures
|
January
MDBF
|
Feb’ary Failures
|
Feb’ary MDBF
|
March Failures
|
March MDBF
|
M3
|
150
|
55,000
|
7
|
64,346
|
5
|
97,088
|
5
|
117,366
|
M7
|
836
|
355,000
|
11
|
466,455
|
8
|
584,168
|
11
|
466,693
|
DM
|
21
|
18,000
|
2
|
37,368
|
4
|
16,051
|
2
|
35,766
|
DE
|
24
|
18,000
|
2
|
43,585
|
9
|
9,124
|
2
|
45,336
|
C3
|
134
|
75,000
|
7
|
93,752
|
6
|
102,796
|
12
|
57,655
|
Fleet
|
1,165
|
153,000
|
29
|
220,676
|
32
|
185,059
|
32
|
205,457
|
The number of primary failures with the M7 fleet jumped back up to 11 in March from 8 in February. This is the same number of primary failures seen in 2013, but this number is still lower than the M7's, which are the workhorses of the railroad, should be hitting. The C3 equipment's MDBF also dropped significantly. The number of primary failures doubled in March, and the MDBF decreased by 44%. The C3's were the only equipment which failed to meet their goal MDBF this month.
On the bright side, the DE's and DM's didn't do as terrible as they did last month. Only two failures apiece stabilized their MDBF's around 35k-45k miles. The Dual Modes performed worse than the DE's this moth. Contrary to popular opinion, the dual modes typically do not break down as often, despite the fact they have more things to break.
MDBF's tend to be higher in the months where the weather is nicer and lower in the months where the weather is colder and snowier (as you might imagine). MDBF's typically average out over the course of the year so a bad month or two does not have a substantial impact on the numbers.
The actual presentation (which starts on page 46 of this pdf) is the same exact one they used last year, and it primarily focuses on the different things they do to maintain the fleet and keep it in working order.
The LIRR's maintenance plan centers around inspections of train cars (which are mandated by federal regulations) as well as additional maintenance work conducted on a certain schedule for the fleet, called "Reliability Centered Maintenance" (RCM).
The first portion of the maintenance plan consists of inspections of all of the LIRR's locomotives and rolling stock:
- Calendar Day inspections are inspections that take place each and every day. Each MU, DE, DM, C3, and work engine is inspected before it enters service. These inspections include interior and exterior inspections, radio tests, and brake tests.
- 60-day (ATC/Wheel) Inspections take place on work engines every two months.
- 92-day Inspections are more thorough inspections that take place four times a year on all locomotives (so this includes the M3's, M7's, C3 cab cars, DE's, DM's, and work engines). The 92-day period is mandated by FRA regulations. While the diesel equipment tends to get broken up and put back together every weekend, MU sets tend to stay together in their same consist for much longer. Consists are shuffled up every 92 days, however, as pairs are plucked off and stuck back on during inspections.
- 180-day Inspections are like the 92-day inspections, except they occour every 180 days instead. Only the C3 trailer cars get inspected this infrequently, as they have fewer moving parts, so they can go longer in-between inspections.
- 368-day (Air Brake) Inspections occour once a year on the DE's, DM's, C3's, and work engines.
As far as maintenance work in shops goes, the LIRR has two primary classifications of fleet maintenance:
- Fleet Modifications is a repair or modification that is implemented on all members of the fleet on a scheduled basis. When MofE finds a fleet-wide defect, or they develop a new, redesigned component that will be better performing and/or more reliable, they implement those modifications on all members of that fleet over a set schedule. As a random example, several years ago the LIRR moved the horns on the DE's and DM's up to the front of the locomotive so they could be heard better (and the DE/DM's wouldn't look so ugly, but I doubt aesthetics played a role). MofE implemented the horn relocation across all of the DE's and DM's over the course of a certain period of time.
- Unscheduled Maintenance basically refers to everything else. If it's not something they planned on fixing ahead of time (i.e. a train breaks down), this is considered unscheduled maintenance.
The LIRR has a set Reliability Centered Maintenance program each of the four passenger fleets. Trains get things like air brakes, trucks, auxiliary power, batteries, doors, couplers, HVACs, Event Recorders, ATC cut out and test systems, are either repaired or replaced during these more extensive RCM programs. The railroad has these schedules setup in such a way that a pretty even number of the fleet is out of service for these repairs over the course of the fleet's lifespan. This maintenance is planned, so it's not like these cars would be missed on a rush hour train like they might be if it had been an unscheduled repair.
In terms of interior cleaning, the LIRR also has some basic guidelines it follows:
- Extraordinary Interior Cleaning (EIC) is conducted every 60 days on the MU's (the electric M3's and M7's) and every 90 days on the diesel equipment.
- Each train is cleaned each morning before it goes into service. This work is done overnight so that all of the cars are ready in time for the morning rush hour.
- The railroad also does less extensive cleaning between rush hours at certain locations, as time and circumstances permit.
- The toilets on the M3's, M7's, and C3 toilet cars are serviced by a third party contractor who comes in and takes care of the business.
At the end of the day, keeping a fleet comprised of well over 1,000 different pieces of equipment in running shape isn't easy, but the MofE department does a pretty good job. There's always that train that will brake down in the most inconvenient location possible (usually on the Mainline and usually during rush hour), but there's not all that much that can be done.
As a final note, the presentation included a snapshot of the Reliability Centered Maintenance schedule. It gives a breakdown of how many pieces of equipment are going to go through which RCM components over the next several years, giving projections from now until 2030. By 2030, the M9's will be well intrenched on Long Island and the M3's will be a distant memory. The LIRR's fleet will ultimately be growing over the next couple of years as they anticipate the opening of East Side Access. I took the data from the RCM schedule and plotted the different points on this graph:
The RCM page also shows the DE's and DM's only being around until 2023, at which point they will be replaced by new locomotives, which would enter service before 2024. This is good to see--not so much because I don't like the DE's and DM's--but rather that it is nice to see the LIRR actually beginning to think about what they want to do with the service past where the third rail ends. Hopefully this time they won't be "penny wise and pound foolish" and order far to few locomotives and coaches like they did last time. Irregardless, the sooner the new equipment gets here the better!
Why do you suppose the C-3's are turning out to be lemons ?
ReplyDelete