In the LIRR's Annual Report on Fleet Maintenance put out earlier this month, the report alluded to the fact that the 45 existing DE's and DM's will be retired in 2023 and replaced with 45 new locomotives (no specification made to whether they will be dual modes or not), all the while the 134 C3 cars will be staying with us through at least 2030. I expressed some concerns at these figures, as replacing a fleet that isn't really sufficient to cover the railroad's growing needs in diesel territory with a new fleet exactly the same size isn't going to solve many problems.
Just how much diesel equipment the LIRR will need going forward will heavily depend on how much progress they are able to make with different electrification projects. The more they electrify, the less diesel equipment they will need. In October, the MTA issued their 20-Year Capital Needs Assessment. In that assessment, the MTA's future outlook provisioned for the expansion of electrification on the LIRR to up to 16 additional stations in Suffolk County. The report stopped short of giving any specifics, like what those stations will be or when those projects might take place (2034 is a long way off).
Glancing at the map quickly, bringing electric service to "up to 16 additional stations in Suffolk County" would sound like it would involve electrifying out to Port Jefferson, Yaphank, and Patchogue. 45 locomotives and 134 coaches would likely be sufficient to suit the railroad's needs if all they had to cover was Oyster Bay, Speonk, and Montauk and Port Jefferson and Patchogue were out of the equation.
In 2023 the current diesel locomotives will be ready for retirement, and a new locomotive order will have to be placed. The question now becomes this: how much progress will the LIRR make with electrification projects by 2023?
If 2023 comes around and they are putting the finishing touches on electrification to Port Jefferson and Patchogue, then they will be able to get away with a locomotive order that is the same or similar size as today's fleet. However, if we roll around the corner into 2023 and we have made little or no progress on electrification at all, then a fleet of 45 locomotives and 134 coaches will be very inadequate for the railroad's needs in diesel territory. The railroad has yet to make some sort of specific timeline for future electrification projects known to the public, so we have no clue if they are even considering having any more electrification done by time 2023 comes around. All we know is that they would like to electrify to "up to 16 additional stations" at some point between 2015 and 2034.
If these electrification projects cannot be completed by 2023, then the LIRR should definitely move to expand its diesel fleet. Once the new locomotives are here, they will be good for another 20-25 years past that point (bringing us into the 2043-2048 time period). Some have voiced concerns regarding expanding the diesel fleet too much might come back to bite the railroad in the behind on the off chance that they do manage to complete electrification someplace in the 2023-2048 time period when the next generation of locomotives are on Long Island. I personally think that holding back on the next fleet purchase based on the hope that electrification will be expanded sometime shortly thereafter would be foolish. Saying we'll only order 40 locomotives now because we are going to start to electrify to Port Jefferson next spring and it won't make much of a difference in a year and a half is very shortsighted and is just the kind of penny pinching that has gotten us in the situation we are in now. While this is a more dramatized example, it would be like the LIRR turning around in the summer of 2012 and saying that they are going to cut service to Penn Station in half at that moment...but it'll be okay because East Side Access is only a year and a half away and everything will be fine at that point. With the MTA, one year quickly turns into eight, and short-term compromises commonly turn into long-term problems. I would be less concerned if the MTA had a proven track record of starting projects when they said they would and finishing them on-time, but that seems to be the exception and nowhere near the norm with this agency.
I am of the opinion that if MU's are not rolling into Port Jefferson in the summer of 2022, the LIRR should immediately pursue an aggressive diesel fleet expansion. Having a surplus diesel fleet leftover if electrification should be completed to Port Jefferson in 2030 would not be the worst thing in the world. It rarely hurts to have some extra diesels lying around in the event that you need some extra help for special events or major catastrophes where electric traction power is knocked out of service (i.e. Long Beach after Hurricane Sandy). It is easier to mothball 10 locomotives and hide them away in Morris Park because there's no use for them then it is to magically conjure up 10 new engines when electrification plans fall through.
So we need a realistic estimation of just how much electrifying the LIRR will be able to do in the next 9 years. At the bottom of this post I have embedded a poll that asks how much electrification you think LIRR will be able to accomplish by 2023. I don't have incredibly high hopes for the amount of progress they will be able to make, given their recent trend of giving into NIMBYs and their demands left, right, and center. It would not be too late for the railroad to have a change of heart with these NIMBYs and start laying some third rail and that Third Mainline Track, but they don't look like they are digging their heels in for a fight anytime soon.
Now to circle back around to the post's title, getting electrification projects done in this day in age are likely going to be very expensive and very painful. While electrification has been proven to lower operating costs on highly-frequency routes, there is a substantial up-front capital cost involved, and local NIMBYs are inevitably going put up a fight. MTA projects rarely go off without a hitch, and the potential for delays only increases as the scale of the project increases.
While electrification would lower operating costs and make travel along the branches electrified easier, faster, and more efficient, electrification will also allow for more direct service to the LIRR's Manhattan terminals, one of which cannot be served by diesel engines, and the other that won't be able to be serviced by either diesels or the dual modes at all (at least initially).
Initializing electrification efforts at this time will likely lead to opposition, delays, and cost overruns. But could the LIRR potentially forgo electrification, for the time being, and instead significantly expand their diesel fleet, particularly their dual mode fleet, in an effort to reap some of the advantages that electrification would bring now, without having to lay any third rail at this point in time?
A dual mode order of about 65 locomotives would be able to provide an impressive level of service from Port Jefferson and Patchogue direct to Penn Station at all times during the day. It would also allow for the LIRR to give a notable bump in service to Oyster Bay and Speonk (as well as Greenport and Montauk during the summer months). Such an order would not be cheap, but it would likely be much cheaper than electrifying most of the railroad. Consider the following analogies to Metro-North's operations in their diesel territory: Port Jefferson and Patchogue would see service patterns similar to what Poughkeepsie sees (frequent dual modes to New York during rush hours, hourly dual modes to New York during off-peak times), Speonk would see service levels similar to what Wassaic sees (through-trains during rush hours as well as the occasional dual mode during the off-peak period and on weekends, then diesels to Jamaica/HPA at other times), Oyster Bay could operate similar to Danbury (handful of direct dual modes during peak hours, off-peak diesels to Jamaica/HPA, but slightly more frequent than Danbury sees), and Greenport would run like Waterbury (shuttles to/from Ronkonkoma).
There is a lot to be said about dual mode service and its popularity among riders who live in diesel territory. The LIRR's current dual mode services are limited to say the least, with just one or two measly round-trips on weekdays to and from Port Jefferson, Oyster Bay, and Speonk. It is worth noting that despite the fact that these dual modes do not nescescarily run into Penn Station at the peak of the peak period (these trains have only been around since the 1990's so they had to be squeezed into the schedule into Penn Station wherever there was room), they are still among the most heavily traveled trains on their respective branches.
Equipment constraints and capacity issues are currently the top two reasons preventing the LIRR from expanding its dual mode operations. There are now only 21 dual modes, and even if all but one locomotive were to be in working order and in service, the maximum amount of dual mode sets they could produce would be 10. Track capacity at Penn Station is also at a premium during pretty much all times of the day, so even if they could produce more dual modes, it would be tough to work them into the schedule. The former issue could be solved with a larger fleet purchase, as mentioned above. The latter issue won't be as much of an issue once East Side Access is completed, taking some stress off of Penn Station (that is, as long as we don't irrevocably hand-off every last spare slot we have in NYP to Metro-North on opening day of ESA, as some demand).
Metro-North has had considerable successes with its dual mode trains. The upper Hudson Line does quite well ridership-wise, and that is likely a consequence of relatively frequent dual mode service into Manhattan at all times of the day. Many communities along NJTransit's diesel lines are also starting to catch dual-mode fever as Raritan Valley Line riders recently got their first taste of direct service to Penn Station earlier this year, and the reactions coming out of the start-up of that service are almost universally positive.
While buying a lot more dual modes will buy riders along all of the diesel branches a significant increase in service, it will also buy the LIRR time to stall off their electrification projects for another 15 or 20 years. Don't get me wrong, electrification should definitely be the goal, but the MTA of 2040 might be much different than the MTA of today. In 2040, the MTA will hopefully be more than the stumbling inefficiency it appears to be today, as all it seems inclined to do these days is award contracts to different companies and hire third-party consultants to figure out what went wrong after those outside companies mess something up.
Who knows, in 2040, the political and financial landscape of the MTA might be significantly different. After several years of decent service through to New York at all times of the day, the communities who live near the railroads to Port Jefferson and Patchogue might be more receptive to the idea of electrification, and the MTA might be in a better position to handle work like this themselves in a way that won't quickly wander off the beaten path.
And if nothing has changed by time 2040 rolls around, then we have this same conversation again and re-evaluate the railroad's needs going forward at that point.
Electrification, quadruple-tracking, and grade separation of the entire railroad should be the ideal goal for the LIRR's future, but in the meantime, the option of pushing electrification off a couple of years with the hope that the MTA and the railroad would be more capable of undertaking such a significant task at a later date should not be off the table entirely, as long as the railroad moves to significantly expand its dual mode and coach fleet in the meantime. I think that a sizable bump in dual mode service could be a suitable substitute for electrification--at least at this point in time.
Included below is a poll asking how much you think the LIRR will be able to electrify by 2023, when the current diesel locomotives will be due for replacement. You can select all options that apply: