Another month has past and we're another month closer to the summer, and that means it's time to report on the LIRR's On-Time Performance yet again.  Systemwide OTP for the month of April 2014 was 93.2%, a slight increase from the 93.0% of March 2014, but still short of goal OTP of 95.1%. A train is considered "on-time" if it arrives at its final destination within five minutes and fifty-nine seconds of its scheduled arrival time.  This can primarily be attributed to a string of relatively minor incidents, as well as a handful of significant incidents.

On weekends, systemwide OTP was 95.5%. Notably, Easter Weekend, the lone weekend since the beginning of  March where a full complement of trains operated, OTP was an impressive 98.6%. Since there were no major weekend incidents beyond a track condition at Country Life Press on the 12th that resulted in 12 terminations, we can see that the trackwork and its associated capacity limitations at QUEENS interlocking clearly places a clamp on OTP.

Days
There were just three days in April where the average OTP for that day was below 90%:

Date
Cancel
Term
Late
Minutes
OTP
Primary Cause
Tues
15
21
1
144
2,820
77.8%
Pole fire east of Westbury
Mon
14
19
12
61
587
87.7%
Track condition in HAROLD Interlocking
Thurs
24
3
4
82
772
88.0%
Downed wire on 12 station in NY Penn

In context of the rest of 2014 year to date, April 15th was the worst day in terms of OTP since the snowstorm of February 13.

There were several days in April that had OTP's between 90 and 95 percent.  Included in this mid-range of OTP numbers are some days that had particularly disastrous rush-hours, but there are a number of circumstances where an evening rush hour was a complete mess, but the overall on-time performance for the day was pretty average.  This is part of the reason why the on-time performance numbers that the railroad puts out each month are unbelievable to some.   Sometimes, a somewhat crazy rush hour could still also lead to these reasonably good numbers. But on the average weekday, the 276 peak trains that the LIRR runs make up only 37% of the total number of scheduled trains for that day. Off-peak service tends to do perform better than those trains during peak hours, since there are fewer trains running, so the effects of a bad rush hour don't impact the entire day's OTP as badly as some may think.

Rush hours
During April 2014, average on-time performance during the AM peak period was 93.4%. During the commute home, average OTP during the PM period was 89.1%.  Traditionally, on-time performance during the PM rush hour tends to be lower than it is during the morning.  In the first couple months of this year, that trend seemed to reverse temporarily, with AM peak trains scoring lower than trains in the evening rush hour, though we appear to be returning to the more "normal" good or exceptional AM rush hours and lackluster PM peaks.

There were 10 rush hours below 90% in April.  The following six rush hours fell below 85%, with the lowest of the month an abysmal 28.8%:

Date
Peak
Cancel
Term
Late
Minutes
OTP
Primary Cause
Tues
15
PM
19
0
75
1,499
28.8%
Pole fire east of Westbury
Thurs
24
AM
3
3
40
390
68.1%
Downed wire on 12 sta. in NYP
Thurs
3
AM
0
2
38
477
72.2%
Track condition in Line 2 ERT
Mon
14
PM
17
0
18
159
73.5%
Track condition in HAROLD
Wed
30
PM
2
0
26
287
78.8%
Heavy rain; equipment problems
Mon
7
PM
0
1
24
204
81.1%
Police activity in Jamaica

Going back to last year, the LIRR pulled off just 3 perfect PM rush hours, where every train arrived on-time.  All three of these were in the late-March and April period. The trends didn't disappoint, and we did in fact have two perfect evening rush hours in April, on April 10 and April 16. The first is even more significant because unlike the 3 in 2013, there were no reverse peak delays this day either! The latter just narrowly escaped, as the first off peak train to Port Washington was involved in a trespasser strike at Flushing-Main Street.

While April's two perfect evening rush hours came less than a week apart, there were two pretty nasty afternoons sandwiched in between:
  • On Monday, April 14 the classic HAROLD Interlocking/East River Tunnel snafu reared its head, as a track condition led to cancellations and delays throughout the rush hour. OTP was 73.5%, with 17 cancellations and 18 delayed trains. There is something interesting to note here: the number of delays is almost the same as the number of cancellations! While combining trains is annoying to those involved, it does help significantly reduce congestion during these types of incidents.  The LIRR has what seems like a "three-tunnel plan" which involves the traditional cancellations and combinations. Minimizing congestion following disruptions is critical, because while the disabled train or track condition may only last a short while, if everybody's in everybody else's way and equipment and crews are out of place, it can take several hours to get everything back to normal.  Some people would say they would rather get home later than have to stuff on a crowded train making all local stops, but it's impossible to please everybody.
  • Tuesday, April 15 saw another painful hiccup on the Mainline. This incident gives us a good example of why putting too many eggs in one basket is not a good idea.  A utility pole caught fire east of Westbury station just before the evening rush was set to start, resulting in a suspension of service on the Mainline while the fire was put out.  It was good that the incident happened at the time that it did, as the majority of people had not left New York yet (thus avoiding would have probably been lots of chaos in Jamaica or stranded passengers at Mineola). As a result of congestion on the Mainline, delays continued for much of the night (if only there was some sort of third track just to the south of the existing two that could have been used to ease congestion...).  Traditionally, when something really bad happens on the Mainline, crews and equipment become out of place, and the delays begin to scatter out to all of the other branches.  In the end, total OTP for this rush hour was 28.8%, which is second only to the January 21st snowstorm in terms of OTP.  Delay minutes came in at 1,499 for the rush hour and 2,300 for the day, as those trains that were held in Mineola were delayed for an hour each.
The two bad AM rush hours were the result of problems in HAROLD Interlocking and New York Penn Station. On April 24th, when some overhead wires came down on a station track in New York Penn, many LIRR trains became delayed as congestion grew, but the average delay was only 10 minutes. NJTransit had a much rougher time that morning, with many of their trains arriving nearly an hour behind schedule as a result of crippling congestion.

There was a perfect morning rush on April 30. Thanks to that the overall performance for that day wasn't so bad, despite heavy rains, flash flooding, equipment problems, and a mess in the evening.

Trains
Train
Origin
 Destination
Cancel
Term
Late
Minutes
OTP
665
Pt. Jefferson
Huntington
0
0
13
143
41%
1719
Huntington
NY Penn
0
0
13
127
41%
2041
Ronkonkoma
NY Penn
0
0
11
86
50%
148
NY Penn
Babylon
0
0
10
97
55%
461
Port Wash.
NY Penn
1
0
9
84
55%
564
NY Penn
Oyster Bay
0
0
10
116
55%
674
Huntington
Pt. Jefferson
0
0
10
95
55%
1715
Huntington
NY Penn
0
1
9
103
55%
2703
Montauk
LI City
0
0
10
173
55%

Most of these trains are repeat offenders, but there are some new trains that made it onto the naughty list:
  • Train 1719: A reverse peak Huntington (departs Huntington at 7:05pm, arrives New York at 8:09pm) train that isn't the last or first with throating.  This is this train's first appearance on the worst list. This is likely the result of several late turns from late turns of equipment/crew turns as a result of late-arriving peak trains earlier in the rush hour.
  • Train 461: This train, the 4:36pm train from Port Washington is another first-timer. This train gets in to New York Penn at the peak of the evening rush hour (5:20pm), but that's normally not a problem. This train's low performance during this month could likely be attributed some of the various East River Tunnel incidents that April saw.  This train also passes through Mets-Willets Point around the ending time of the occasional 1:10pm day game, and regularly scheduled trains tend to lose a couple minutes at that station.
  • Train 2703's delay minutes number is pretty misleading, since it incurred an 85 minute delay on April 10th due to equipment trouble in Southampton. That one incident aside, congestion and switch problems in QUEENS continue to this run.
  • Train 2041, a midday Ronkonkoma run that leaves there at 11:11am, has been having some trouble so far in 2014.  There was nothing out of the ordinary about its performance during 2013, but through the first four months of this year, it seems to be working its way in among the troublemakers.  There aren't too many excuses for why this train could arrive late, but NYAR does send RS50/RS80 out to switch the Mainline around this time of day, so perhaps it could be getting caught up in freight interference.
244 weekday trains were not delayed at all this month, 28 have yet to arrive late so far this year.
With May comes Hamptons service, crowds of unfamiliar tourists, and thunderstorms. Let's see what happens. We're not off to too good a start though, with a nasty PM Peak on the May 2nd (how does 39.8% sound?) and an ugly May 7th (disabled train at New Hyde Park, track conditions at Bethpage and Flushing-Main Street, two bridge strikes, and more!).

The full table of OTP broken down by day, rush hour, and train is embedded below.  If you subscribe to get posts by e-mail or RSS, you may have to view this post in your web browser to see the table:

1 comment:

  1. Re: Departure of LIRR's Helena Williams worries Island officials - Per the Newsday article, Brookhaven Town Supervisor Ed Romaine has been calling for the reopening of the LIRR Center Moriches station for a while now. Ed and Town Councilman Dan Panico informed folks at a recent meeting of the Moriches Bay Civic Association of this. I sincerely hope Supervisor Romaine keeps the pressure on the new LIRR president. Ms. Williams and the LIRR were responsive to Ed in the past when he was a Suffolk County Legislator and took the lead in pressuring the LIRR to implement the Deer Park to Riverhead "Jury Train".

    You know my position on reopening our Center Moriches station, which I have expressed to you in the past. The fact that MTA/LIRR closed us down in April 1998 at the advent of C3 cars, citing the dubious claim of "low ridership", coupled with a cheapskate mentality at the time of not wanting to invest the money to build a raised platform station, was in my humble opinion a classic "penny wise and pound foolish" decision, with absolutely no thought given to future growth of the area and its future needs for rail service. In the ensuing 16 years Center Moriches and its neighboring communities of Moriches, East Moriches, and Manorville have seen tremendous growth, more than enough to again warrant a local centralized railroad station.

    The other point about possibly moving the Yaphank station 2&1/2 miles east to William Floyd Parkway should also not be dismissed out of hand altogether. It might make a lot of sense. The current 1-car Yaphank platform doesn't even have a TVM. I guess what is keeping it open at its current location is its proximity to several Suffolk County Government agencies, and of course, Suffolk County Police Headquarters. However, currently, I don't think more than a half dozen people use this station. and then primarily only for the westbound morning train and the eastbound evening train. I personally have never counted more than 3 vehicles in the station parking lot.

    Yaphank Station



    A station at the intersection of the major north-south artery William Floyd Parkway and the Long Island Expressway would be ideal for serving Yaphank, North Shirley, Manorville, and north to Ridge, Shoreham and Wading River. If we could ever get the LIRR to think big about the future of Central and Eastern Long Island, they'd tack this on to the Ronkonkoma double track project, and continue electric train service to this revised Yaphank station location.

    ReplyDelete