For today's Track Feature Tour, we'll take a very quick look at Belmont Yard. At the Belmont Park station, passengers have to board and alight trains by way of permanently fixed wooden steps, as Belmont Park is the LIRR's only low-platform station, and all of the equipment the LIRR uses is capable of boarding at high-level platforms only. At Belmont Park, only the middle six of the eight tracks have these staircases. The easternmost and westernmost track (tracks 1 and 8) do not have these wooden steps, so by a minor technicality, they are not considered station tracks and are instead considered part of Belmont Yard.
The 146th running of the Belmont Stakes will take place on Saturday, June 7th. With a potential triple crown bid in the works, it is likely going to be a popular race this year. Several have asked about the LIRR's service plans for this Saturday. At the time this post was written on Monday morning, the LIRR had not yet released its full service plan for the day of the Belmont Stakes. However, all of the extra racetrack trains for the day have been loaded into the point-to-point schedule finder on the MTA's Website. Just put your origin station (or New York/Jamaica), set the destination as Belmont, and the date as June 7th and you will see the schedule for all of the trains the LIRR anticipates running that day. We're not long from the day of the event now, so I would expect the full timetable and details to be released shortly.
I will have a little more information on Belmont Park and the Belmont Stakes next week as we get closer to the "big race," so stay tuned!
Are there plans to get this station for high level platforms? If LIRR has no plans, maybe NYRA could foot the bill.
ReplyDeleteThere are no plans at the moment, but what's the point? The station works fine for its purpose. It's a terminal, so it's not like they have to worry about longer dwell times at stations. It's not ADA accessible, but that can be solved in ways that don't have to involve constructing costly high-level platforms. I doubt NYRA will foot the bill considering how many people use the station on the average race day.
ReplyDeleteIf they ever do The Right Thing and turn this into a park and ride, surely they will install at least 1 hi-level platform.
ReplyDeleteOver the course of the winter there was always a variety of equipment in the yard between gravel hoppers, mofw equipment and recently they had a M7 set parked there. Always interesting to see what was parked as I drove by on the Cross Island Parkway on my way to work. With all the ADA requirements I'm surprised they could get away with not having a high level platform unless there is a minimum amount of traffi
ReplyDeleteThey will probably do that, but it wouldn't be required. The fact that the station has low-level platforms should be no obstacle to increasing service. They could increase service all they want without having to spend a penny on the station. Once ridership ticks up, the installing high-level platforms becomes more favorable.
ReplyDeleteAnything constructed before the Americans with Disabilities Act was passed into law in 1990 is not subject to the law. There are many stations on the LIRR that are not ADA accessible, despite having high platforms. Anything that undergoes significant reconstruction work (i.e. a station renovation) would trigger the ADA requirements so it would need to be made accessible then, but as long as they don't to significant work on the station, they do not need to make it fully ADA accessible at this time.
ReplyDeleteThe schedule for the Belmont Stakes Day is up on the website
ReplyDelete