Yesterday, a document popped up on the MTA's website saying that the LIRR was considering leasing some sort of supplemental diesel equipment to supplement the current fleet which is far too small to carry on like it is now.
From the RFEI: "MTA Long Island Rail Road (LIRR) is contemplating supplementing a portion of its current fleet of passenger diesel locomotives and passenger rail cars via a lease agreement. The LIRR is interested in obtaining sets of equipment which are highly reliable and are in good working order in the following configurations:
- "Group A: Up to five consist that contain two locomotives and seating for 420 passengers each
- Group B: Up to two consist that contain two locomotives and seating for 280 passengers each"
The document goes on to say that the cars have to have heat and AC and the like (consider yourselves lucky, that used to not be the case on many railroads!). The document also says that the cars must be ADA accessible and able to board at high-level platforms. The cars must also be able to meet all of the LIRR's clearance requirements (presumably including New York Penn).
The document then says that the equipment would be able to run at speeds as high as 80 m.p.h. (though there's not an inch of anything close to 80 m.p.h. territory east of Ronkonkoma and for the vast majority of the Oyster Bay branch).
There's not that much else to it. It's basically just a "feeler" that the LIRR's putting out to see if anyone possibly has something that they would be able to lease to the LIRR.
So who could the LIRR possibly lease from? It would have to be another passenger railroad, unless some random Joe Snobgrass is sitting around someplace with seven cars and four locomotives tied up in his backyard. Because they would have to meet pretty tight clearance regulations, the only real candidates are other New York-area railroads. Obviously the LIRR isn't going to lease stuff from themselves, so we can cross them off the list. Moreover, Metro-North doesn't really have a surplus of Shoerliner coaches, and judging from their ongoing implosion on the New Haven Line, I'd think they'd quite like to keep what they have on their own rails, even if they aren't getting used.
The only candidate I can think of is NJTransit. However, they're equipment took a hit after Hurricane Sandy and they are still yet to completely recover. Of their 932 normally available coaches (both Comets and MLV's), 213 were damaged during Hurricane Sandy, and 54 of those have still yet to be returned to service.
If Hurricane Sandy hadn't happened I'd say NJTransit would be the best bet. A while back they tried out the "Atlantic City Express Service" (ACES) where there would be a direct train from NYP and NWK to Atlantic City. For that service, NJTransit acquired four hand-me-down P40's from Amtrak and the casino owners pitched in for eight specially modified MLV cars. Since then, that service has gone belly up, and those locomotives and/or cars have been either damaged or pressed into everyday service on NJT. The four P40's and eight MLV's would be perfect for the LIRR since they would positively fit every dimension in NYP, and very possibly on the whole railroad.
But with NJTransit's shaky recovery after Hurricane Sandy, I can't quite see them floating some cars over to the LIRR without having their full fleet restored in the first place.
Once you go outside the New York Metro things get dicey. Other railroads might have surplus equipment, but if they can't work with the LIRR's pretty tight clearances and requirements, they won't be too good. And while some out of the ordinary stock might be fine for the lowly Greenport Branch, where there are hardly any overpasses and all of them leave plenty of room, keep in mind that that equipment will have to touch the rest of the LIRR system at some point to get fueled and repaired.
Bottom line, I like what I'm seeing from the LIRR, their diesel fleet is far too small and it needs more cars and more locomotives, especially in the summer. What they're doing is a smart move as any new equipment purchases (yes, even DMU's) are still years away from hitting the rails. However, due to the unique characteristics of the LIRR, I wouldn't hold your breath for the LIRR to get too many e-mails back about this.
The document said:
ReplyDeleteGroup A: Up to five consist that contain two locomotives and seating for 420 passengers each
Group B: Up to two consist that contain two locomotives and seating for 280 passengers each
Nothing about amount of cars, just amount of seats.
I can only assume Group A is for 4 car trains and Group B for 3 car trains.
Notice 2 locos per train, which means they do not want cab cars as such.
The 8 ACES cars were all seriously Sandy-damaged, and will be rebuilt into conventional MLV commuter coaches by Bombardier in the Avoca, NY facility. The fine print with the Casinos is that NJT had to take title if the service went belly-up, which it did.
There are about NJT 45 Comet-3 cars, none of which have seen service in several years, but were Sandy-damaged in the Meadowlands and Bay Head. They have a narrow black window strip and a center door. (Comet-2’s have no center door; Comet-4’s have a broad black strip with a center door). Comet-2’s and 4’s are still in service. Metro North has title to 2 others, as they were once used in West-of-Hudson service. They have been resting peacefully behind Croton-Harmon shops for several years. Metro North plans to convert them into business/inspection cars for West of Hudson service.
Do keep in mind the LIRR's diesel fleet is incompatible with any other railroads. The MU jumper cables have 32 pins. The industry standard is 27 pins. Locos would also have to be modified with LIRR’s cab signaling, speed control, and pulse codes.
The trouble with running a Greenport train out of Hunterspoint is that it would be overwhelmed with Ronkonkoma passengers, or it would have to run non-stop to Medford, which cuts off their access to anyone unless they originated from Jamaica and points west. Intra-island travel to the North Fork would be impossible.
"The trouble with running a Greenport train out of Hunterspoint is that it would be overwhelmed with Ronkonkoma passengers, or it would have to run non-stop to Medford, which cuts off their access to anyone unless they originated from Jamaica and points west. Intra-island travel to the North Fork would be impossible."
DeleteMy idea for a direct Friday-only train I had a while back was a train that originated from Jamaica at 4:54pm and ran non-stop to Medford, arriving there at 5:45pm, which is about 14 minutes behind train 252, which terminates at Yaphank. Intra-island passengers can switch trains at either Medford or Yaphank. Train 252 would then wait on the YA siding until the Friday-only train would pass, then it could get back west to Ronkonkonkoma in time for train 256.
~ Patrick @ The LIRR Today
OK, so rather than make the Yaphank train the Greenport train, which entails deadheading a 2nd equipment set during the afternoon, run the old "Shelter Island Express", which hasn't run as such since around 1981. That's a good idea. Be good marketing to follow-up after the Cannonball's makeover.
ReplyDeleteJust see if it can be threaded through the Main Line, handle any single track meets on the Ronkonkoma Branch, as well as any catching up behind local electric trains.
I've got a crazy idea. What about picking up the mothballed RDCs of the Trinity railway express? They can't be in that bad of a condition since they decided to go with DMUs to replace them.
ReplyDelete