The block limit signal here lies between BL BH in Bridgehampton to the west and BL MY in Montauk to the east, resulting in two roughly 10-mile blocks to either side of the station. Trains have the ability to pass one another on the passing siding located here, though there are no regularly scheduled meets at this siding. The siding is about 1,450 feet long, which is the equivalent of a 17 car train. The switches at this location are hand-thrown and must be operated by a crew member on-site.
| There are more car markers than average daily passengers at Amagansett station. |
| Passengers awaiting the arrival of a westbound Montauk Branch train on a summer Sunday in 2013. |
The average daily ridership at the station can be counted on one hand, so 2 cars is just fine on, say, a snowy Wednesday in January, but in the summer, significant crowds often swarm the station (and the adjacent parking lot, since they all can't fit on the actual station platform), and when the train does arrive, it is often delayed as they have to wait for people to cram in the four different doors.
The slow loading delays incurred here, at just the second stop for westbound trains, plant the seeds for delays that can cascade many times down the line and throughout the day. Dropping the stop at Amagansett (as the Cannonball, and the westbound Cannonball on Sundays do) helps mitigate this, but cutting stops at this station only makes the situation on the remaining trains worse.
This block limit station has been here since the summer of 1928 when an unattended block station was put in service on May 23, 1928. Going forward, the LIRR expects to turn BL AG and the passing siding here at Amagansett into a "control point" as part of of the Speonk to Montauk Signalization Project. For reasons that don't really make much sense to me, the railroad is not going to make this an interlocked siding like Southampton or Hampton Bays, meaning that if a meet has to be moved to this siding when delays arise, train crews will still have to get down and operate the electric lock switches there to use the siding.
So we will only have a Block Limit signal here for a little while longer, as it will ultimately be replaced with the new signal system in the coming years. Hopefully it will allow the railroad to improve reliability and flexibility during delays, but I don't think it will cure all of the problems!
The same penny-wise pound-foolishness of 1 and 2 car platforms is being repeated with refusal to remote-control the siding there with PTC, which will be back to bite them in the @$$ for years to come.
ReplyDeleteYears ago, there was "talk" of a weekend hikers station somewhere between there and Montauk, as MN has on the Hudson Line. A cheap, wooden 50' high level platform would not break the bank, nor trigger expensive ADA requirements.
Why would "a cheap wooden 50' high level platform" be exempt from ADA?
ReplyDeleteI think, though not 100% sure, if they keep expenses below $100K, it stays under the radar screen, and except from ADA.
ReplyDeleteI don't believe triggering or not triggering ADA requirements has anything to do with the total project cost, but rather the relative size of the project cost. If making the "primary function area" (in this case the station platform) ADA accessible would cost up to 20% of the total project cost, then they would be expected to make the primary function area accessible. However, if the cost of making the station ADA Accessible would exceed 20% of the total project cost, then it would be considered disproportionate and they would not have to make the station ADA accessible.
ReplyDeleteSo if the total cost to build the station would be, say, $100,000, the LIRR would have to make it ADA accessible if the total cost to make it accessible would be $20,000 or less. Since a station in the middle of the woods would likely require a considerable amount of path/paving work to get accessible riders to the temporary station, it would probably be safe to assume that the cost to make it accessible would exceed 20% of the total cost of constructing the station, it would not be subject to the ADA regulations.
If it's so apparent what it means, how come the union supporters are constantly claiming that "two" PEB's said that they should get that deal. The second PEB doesn't recommend a good deal, they just pick the lesser of the two evils. They shouldn't be passing it off as such.