The LIRR's current Electric Multiple Unit (or MU) fleet currently consists of 986 different railcars.  Of those 986, there are 836 M7's, which were built by Bombardier and entered service on the LIRR beginning in 2002, and 150 M3's, which were built by Budd and have been in service since 1984.  At one point, the M3's, and their visually similar counterparts, the M1's, were the only type of MU car on the LIRR, but in the early 2000's the LIRR began taking acceptance of a much newer and more modern railcar, the M7's.  As the M7's arrived, the railroad swiftly moved to retire what was left of the M1 fleet, and the M1's made their last revenue trip on LIRR rails in 2007.  The smaller and marginally newer M3's have stuck around, and they can still be seen running on the rails to this day.

As many can tell just from looking at the two, the M3's and M7's are significantly different. From their visual appearance, seating styles and arrangements, operating cabs, and many other things, even the most casual LIRR user notices the big difference between the M3's and M7's.  Some love the M3 equipment for various reasons, but others hate them with a passion.  But when it comes time to send particular sets of equipment out on runs, there are few physical differences between the M3's and M7's.  They are both the same length, the same height, and the same width.  They both run on third rail power and they're both married pairs.  With very few exceptions, any train that can operate with M7 equipment could also be operated with M3 equipment, and vice-versa.  The M3's can go practically anywhere the M7's can go, and the M7's can go practically anywhere the M7's can go.

So what is the chance that your train is operated with M3 equipment?  First, it can't be a diesel run!  The chance of an M3 rolling into Patchogue under its own power anytime soon is zero.  But beyond that, there really is no way of telling which trains will run with M7's and which ones will run with M3's.  The LIRR does not specifically assign any one type of equipment to any one particular train.

The M3's do tend to gravitate towards certain trains and certain places at different times of the day, and through some math, background on logical turns of equipment, and some Microsoft Excel magic, it is possible to evaluate what percentage of time trains operate with M3 equipment.  I won't bore you with the specifics regarding the way these numbers were statistically calculated, but they are capable of giving a reasonable approximation of how frequently a certain train operates with M3 equipment.  For example, out of a sample size of roughly 70 different weekdays, Babylon train #35 operated with M7 equipment on about 58 of those occasions, and with M3 equipment on roughly 11 other days.  This means that train #35's "M3 Percentage" is 17%, meaning that this train operates with M3 equipment roughly 17% of the time.  Applying a similar methodology to all of the LIRR's MU runs can give you a pretty accurate approximation as to how often that particular train operates with M3 equipment.

The PDF document below provides an approximate "M3 Percentage" for each of the LIRR's 1,036 scheduled MU runs.  There are three sets of data provided: the first shows a listing of all trains, sorted by train number, and what percentage of the time they operate with M3's.  The second shows only regularly-scheduled weekday trains, sorted to show the trains that most frequently run with M3 equipment on the top.  The third set is a similar list for weekend trains.

You can view the file online here:

I spent some time combing through all of the data, driving the sort and filter functions of Microsoft Excel crazy, but the more and more I analyzed the data in the above linked document, looking for some sort of specific pattern, I became more and more convinced that there simply aren't any patterns as to how the LIRR assigns M3's.  There's one exception on the weekends where you could narrow it down to M3's operating on two specific branches, but other than that, there is no set standard or pattern for which trains get M3's and which ones get M7's.  In fact, the MTA's Service Guidelines explicitly state that cars will not be assigned with regard to age, so the railroad essentially treats both the M3's and M7's as equal (for the purposes of determining equipment). 

M3 equipment still tends to gravitate to certain runs, but even there the absolute best probability of getting an M3 you can get is just 51% (train 1205).   When all trains are considered, you have a roughly 1 in 10 chance of getting a train with M3 equipment on an average weekday.  On weekends, you have just a 13 in 500 chance (or a 2.6% chance) of getting an M3 on your train.

There are a couple of different ways you could go around analyzing this data.  Just looking at the sorted list of trains doesn't give you many clues regarding the patterns as to how M3 equipment winds up on those trains.

I first tried analyzing the data by considering what time the trains operate, to see if there was a certain time of the day in which you are more likely to catch an M3.  I took the M3 percentages, and the current scheduled departure times for weekday eastbound trains and generated the following XY-scatter plot showing each train and what the probability that that train would operate with M3's.  I then added the red trendline to see if there were any particular observable trends:

This graph shows that there is a higher chance that you will end up with an M3 during rush hour, but the increase in probability is marginal, since your chance is almost just as good during the midday or reverse-peak period.  In fact, the mild bump in M3 presence during the reverse-peak period suggests that these trains aren't just making one round trip a day like several sets of equipment currently do, they're out there pretty much continuously just like any other train.

There is a slight uptick at the very end of the day, as the LIRR appears to have M3's pinch-hit for the trains that depart immediately after events at Madison Square Garden, as they are a bit better at handling larger crowds.

But aside from that, your chance of getting an M3 remains fairly constant throughout the entire day.  There are more trains during rush hour so you would likely have a shorter wait if you were specifically wanting to catch an M3, but statistically speaking the variance over the course of the day is pretty minimal.

Since the time of day doesn't appear to have too much influence on the likelihood of your train operating with an M3, perhaps where you are on the LIRR might have something to do with your chance of having M3 equipment on your train.  The following graph shows the average probability of your train having M3 equipment to or from each of the different electric terminals on a weekday:

Looking at this graph, you can tell that the M3's do tend to gravitate towards the Mainline local trains (the Hicksville and Westbury runs).  This makes sense, considering that the Mainline is very much at capacity and every seat counts during rush hour.  But, before we accept this as a definitive trend, even though you are the most likely to get an M3 on a Hicksville train, the probability of that is still just 16.7%, so we can hardly call that a definitive pattern. Long Beach, Babylon Zones, and Huntington trains also tend to get a higher share of M3's, but it's still just barely a 12% chance of getting an M3.  At the very bottom of the pack, you are very unlikely to get an M3 on a West Hempstead or East Williston train.  Considering the chance of getting an M3 on an East Williston train is 1.45% and just 0.77% on a West Hempstead train, seeing M3's at those places are pretty rare occurrences.

Seeing an M3 out on the rails is much less common on weekends, where there are more than enough M7's to cover weekend service, but there are two specific locations where M3's tend to gravitate twoards on weekends. The playing field is fairly level on weekdays, but calculating a similar set of statistics shows that if you want to catch an M3 on a weekend, your best chance is to go to either Hempstead or Far Rockaway:

But, again, even though the Hempstead and Far Rockaway Branches are far and away the best places to catch an M3, the probability of you actually getting an M3 is still very low, with just an 8.62% chance of getting an M3 on a Far Rockaway train.  The remaining branches barely crack 1% on weekends, though, but there are a couple of Babylon or Ronkonkoma trains on which you might be able to snag an M3, if you so desired.

Since we are unable to find any definitive patterns on the eastern end of operations, perhaps which western terminal the train serves makes a difference:

But, alas, again there are no definitive patterns that can be observed.  New York trains have the slight advantage over Brooklyn trains, but the probability is still just around 10% for New York trains and 9% for Brooklyn trains, hardly a convincing margin. 

So, in the end, when you try to determine if there is a pattern to which trains operate with M3's and which don't, the answer in the end is that it is essentially patternless.  There are general guidelines you can pick out from the above linked .pdf and the things mentioned in this post above, but the best you can do is get around a 20% chance of getting an M3.  For now, the LIRR's M3 fleet will be sticking with us in its current numbers until the LIRR begins taking deliveries of its new M9 railcars from Kawasaki, at which point the M9's will replace the M3's just like the M7's replaced the M9's, and once that happens, you'll have a 0% chance of catching an M3, so get them while they last!

4 comments:

  1. Holidays are not like weekends. On Christmas, there were 3 or 4 sets running to Huntington and Ronkonkoma all day, and at least one on a Brooklyn cycle. That just doesn't happen on weekends, Being that Xmas was a weekday, perhaps they did not park them in the usual place in the yard overnight as though it was a Friday to keep them stashed, and out they came.

    ReplyDelete
  2. Fascinating information! Thanks for posting.

    ReplyDelete
  3. Can you do an analysis of M3s OTP vs the M7 OTP? I swear that every time my train ends up being delayed, it is most likely because it is an M3 with equipment issues.

    ReplyDelete
  4. Interesting. Metro North seems far more consistent than LIRR with using M3s on the same trains pretty much day after day.

    ReplyDelete