Friday, June 27, 2014

MTA Establishes Transportation Reinvention Commission

The MTA's new "Transportation Reinvention Commission" met for the first time Wednesday after the MTA announced the 24 members of the new reinvention commission earlier this week.  The commission was formed after Andrew Cuomo, New York State Governor and rare friend to the MTA, urged the agency which funds the LIRR to consider changes in things like rider expectations and commuting trends as it develops future Capital Plans.

The 24-member panel consists of transportation experts from around the region, around the country, and around the world.  The full list was posted on the MTA's website on Tuesday:
  • Co-Chair Ray LaHood, Senior Policy Advisor, DLA Piper
  • Co-Chair Jane Garvey, North America Chairman, Meridiam Infrastructure
  • Rohit Aggarwala, Professor of Professional Practice in International and Public Affairs, Columbia University
  • Richard Anderson, President, New York Building Congress
  • Kate Ascher, Associate Professor, Columbia Graduate School of Architecture, Planning and Preservation
  • Andy Byford, CEO, Toronto Transit Commission
  • Isabel Dedring, Deputy Mayor for Transport, London
  • Alain Flausch, Secretary-General, International Association of Public Transport (UITP)
  • Dall Forsythe, Senior Fellow and Adjunct Professor of Finance, NYU Wagner Graduate School of Public Service
  • Craig Gotsman, Professor, Jacobs Technion-Cornell Innovation Institute, New York City
  • Gary LaBarbera, President, Building and Construction Trades Council of Greater New York
  • Kevin Law, President and CEO, Long Island Association
  • Robert Lieber, Chairman, ULI New York
  • Enrique Peñalosa, Former Mayor of Bogota, Colombia
  • Robert Puentes, Director, Metropolitan Infrastructure Initiative and Senior Fellow, Brookings Institute
  • Denise Richardson, Managing Director, General Contractors Association of New York
  • Gene Russianoff, Staff Attorney, Straphangers Campaign
  • Veronica Vanterpool, Executive Director, Tri-State Transportation Campaign
  • David Waboso, Director, Capital Programmes, London Underground
  • Mark Willis, Executive Director, NYU Furman Center for Real Estate and Urban Policy
  • Larry Wolinsky, Chair, Hudson Valley Pattern for Progress
  • Kathryn Wylde, President and CEO, Partnership for New York City
  • Robert Yaro, President, Regional Plan Association
  • One additional member to be announced
Co-chairs Ray Lahood and Jane Garvey will oversee the remaining 22 members, who will serve on five different subcommittees which will examine the different operating agencies in the MTA system.  The commission will hold public input sessions featuring presentations and opportunities for public comment.  (No specific information has been announced to the public at this moment, but MTA Chairman mentioned July 15th, 16th, and 17th (hopefully in the evening when people who have day jobs can actually go) in Wednesday's board meeting).

The commission will re-evaluate what the MTA's needs will be going forward as it prepares it's next Capital Plan (which will run from 2015 through 2019).  The next Capital Plan is due to the Capital Program Review Board on October 1st of this year, so they will be on a tight schedule if the MTA will want to make any changes based off of their recommendations before the October deadline.

A new look at certain aspects of what the Long Island Rail Road is doing now--and what it's priorities should be going forward--will be just what the doctor ordered.  In terms of present service patterns, we have not seen the current service patterns and train timetables change significantly since electrification was completed to Ronkonkoma in January of 1988.  While Metro-North has completely overhauled their schedules several times in the past year alone, trains like the 6:39am out of Ronkonkoma and the 5:20pm out of New York to Long Beach have been departing within a few minutes of their current times for nearly 30 years.  Every now and then the railroad adds or drops a train, tweaks the stopping times a couple minutes here or there to work around trackwork, but the railroad's present schedules are still remarkably similar to the ones that went into effect on January 18, 1988.

The Long Island of 1988 and the Long Island of 2014 are significantly different and the needs of the riding public have changed significantly over that period of time.  However, the LIRR hasn't really been keeping up.  Things like reverse-peak and intra-isand travel have grown considerably in recent years, but the railroad has done little to encourage and foster that growth.  Simple things like turning equipment trains that run empty in the prime of the reverse-peak period into revenue runs or using the existing fleet and crew resources more efficiently or more creatively wouldn't take a whole lot of effort or money, but it would definitely help those riders in the railroad's "developing markets."

It will be interesting to see what this committee will focus on during it's time-constrained existence, and it will be particularly interesting to see how much input they accept from the public, i.e. the people who use the services every day.  We will also have to see if the MTA will seriously consider the recommendations of this commission or not in the final development stages of their next capital plan, or if they will just skim the report and toss it in a drawer like they have with various others.  The more seriously the commission considers input from the public, and the more seriously the MTA accepts the recommendations from the commission will be a huge factor that would determine the effectiveness of such a commission.  We will be that much closer to East Side Access' completion at the end of the next capital program, so now is the time for the LIRR to start getting things in order--and if it's going to steer its course based on 26-year old service patterns, a 20-year old Network Strategy Study, and an 8-year old Origin and Destination Study, they run the risk of steering the LIRR ship right into the rocks.

15 comments:

  1. Third track. Third track. Third track.

    ReplyDelete
  2. The trouble with these commissions and MTA planning in general is that they look only at expensive solutions, listen only to over-priced consultants and planners, and do not even think of cheap do-ables. In the end, they come up with nothing.

    For one thing, they don't understand the concept of short turns.

    It would not break the bank to run hourly NYP - East Williston locals midday, weekdays. Two 6 car train sets would not break the bank for the 45 minute run. The could split an arriving 12 car train in two in the AM rush rather than deadhead to Mets Stadium or Long Beach for mid-day storage. Run off Track 20 and do not go to WSY.

    Then each hour:

    - remove the Mineola stop from most Ronkonkoma trains (already done on weekends with half-hourly Huntington trains),

    - remove the Woodside stop from a Babylon train,
    - remove the Kew Gardens, Forest Hills, New Hyde Park and Merillon Avenue stops from the pokey Huntington/Port Jeff milk trains.



    These trains would be sped up and crowds could be dispersed, maybe even encourage some people to choose the Port Jeff over the Ronkonoma line. The local stops would be assumed by the East Wililiston locals, which would be more likely to be on-time.

    It could be implemented Monday morning.

    ReplyDelete
  3. Enrique Peñalosa, Former Mayor of Bogota, ColombiaWhat on earth does the mayor of Bogota know anything about transportation?

    ReplyDelete
  4. This seems to be for the MTA as a whole and not just the commuter rail/subway side. The MTA is already experimenting with a form of BRT with the select bus service so it makes sense to bring in someone with experience setting up a BRT system.

    ReplyDelete
  5. He's probably being brought in for the Select Bus Service routes that MTA Bus and NYCT are doing. The Bogota system is currently considered the BRT system to emulate, and he implemented it fairly quickly, but since he's left office the system has languished with expansions slowing down and overcrowding issues.

    ReplyDelete
  6. I'm aware that it is for the whole MTA, but one of the key functions of a successful portion of the MTA system is its ability to tie into the rest of the different parts of the system. A nice SBS system is fine, but it loses value if it cannot tie into the subways, local bus routes, or commuter railroads effectively. Either way it will be interesting to see what recommendations he has for the SBS system.

    ReplyDelete
  7. Have a look at his biography before criticising.

    He has a background in urban and transport planning which is probably why they brought him in rather than for being mayor of Bogota for 3 years

    He is head of the Institute for Transportation & Development Policy which is based in NEW YORK

    So he actually knows rather a lot about transportation.

    ReplyDelete
  8. But it loses even more value if it isn't done right itself.

    ReplyDelete
  9. The overwhelming majority go to/from NYPS. It simply moves a cross platform transfer from one place to another 40 minutes further east. I don't see the big deal.

    People with all their luggage and straw bags get to be in an 8 or 10 car MU with 4 or 5 bathrooms and decent luggage racks 40 minutes more than stuffing themselves into a 4 or 5 car C-3 with 2 bathrooms and crappy luggage racks.

    The Cannoball analogy isn't valid. The transfer was totally eliminated from NYPS, not shifted from Babylon, which proves one of my point further.

    ReplyDelete
  10. SBS is interesting if you look at it as the "second tier" of services, similar to the BMT's old hierarchy of subway/el, trolley, trolleybus, and bus. The current routes are all able to complement the subway as feeders (Nostrand, Webster, Hylan) or crosstown routes (34th, the northern segment of Nostrand, Fordham). Some also double as stand-ins for future subway service (Second, hopefully Nostrand and Woodhaven), but the important thing is that it puts lines on the map.

    Integration with commuter railroads has always been iffy, but that's more of a function of "The commuter railroads aren't really integrated into the city at all" rather than a flaw of SBS routes themselves.

    ReplyDelete
  11. What stations does the 12 car cannonball do double stop? same ? for when its 10 cars. Do any other trains double stop out east? Do any others need to?

    ReplyDelete
  12. The Friday Cannonball has to make a double stop at all stations (including Montauk). It is is one and only train that makes double stops.

    See the map I published in the Visualizing LIRR Platform Length post for specific platform length and train positioning, but in summary:
    Westhampton: H8
    Hampton Bays: H6
    Southampton: H8
    Bridgehampton: H6
    East Hampton: H6
    Amagansett: E2
    Montauk: E6

    All of the stations the Cannonball stops at the platforms are at least 6 cars long, so they can platform all cars with two stops.

    There are other weekend trains that run with 10-car consists (the Hamptons OTP spreadsheet has consist information as well). All other trains just platform the cars as prescribed above and passengers in non-platforming cars walk forward or back.

    ReplyDelete
  13. On Sunday , the 29th, we have the Montauk LOCAL:

    Delays Posted: 06/29/2014 3:59PM

    Westbound:
    The 1:31PM train from Montauk due Jamaica at 4:09PM which is operating 11 minutes late at this time, will make added stops at Hicksville, Westbury, Mineola, Merillon Ave and Hillside Support Facility (for employeesonly). This is due to a train being as a result of fire department activity in Huntington.

    ReplyDelete
  14. All I wanted is a regularly scheduled Hicksville stop..lol

    ReplyDelete
  15. Railroads also suffer from excess conservatism; "we've always done it this way" seems to be a very strong factor, and that can fight against standardization even when equipment replacement has to be done anyway. (Consider that the longstanding plans to rewire Amtrak catenary to 60Hz aren't being done... and now Amtrak is buying expensive new custom frequency converters. 'Cause they've always done it that way.)

    It's even less understandable when a railroad is implementing a new system and does something different from its neighbors -- those 36-pin MU cables are bizarre.

    ReplyDelete