The MTA declined to respond to questions about train speeds on LIRR or Metro-North, if any speed improvements have been made or are planned for the railroads, or if there will ever be any expansion on the few sentences in the final task force report, despite multiple requests.
It's very unclear what—if any—actions have been taken by the railroads or are planned as result of the Train Speed and Safety task force. Back in October when the preliminary findings were announced, officials confirmed that the new look at train speeds would also apply to the LIRR, though officials did not offer any details about what that would entail. At the time, Kevin Sexton, the general chairman of the union that represents LIRR train engineers (the BLE&T), told Newsday that MTA management had not reached out to him about any potential plans to address train speeds on the LIRR.
![]() |
| A permanent speed restriction sign at East Rockaway (Photo: The LIRR Today) |
In 1933, the LIRR advertised special Fishermans deals on trains to Montauk, with schedules showing trains making the trip from NY-Penn Station to Montauk (with a change at Jamaica) in 2 hours, 30 minutes flat. Local trains to Montauk were scheduled for 2 hours, 50 minutes in 1936. Today, those weekend morning express trains to Montauk are scheduled to take about 3 hours, 6 minutes, and weekday rush hour trains take about 3 hours, 15 minutes. Even today's fastest express train, train 2710 (the off-season version of the Cannonball) takes 2 hours, 32 minutes making only four intermediate stops. The fact that it takes most trains 30-45 minutes to go from Manhattan to Montauk today than it did in 1933 is certainly not good...
Historical resources: Old LIRR timetables
There are a handful of old timetables floating around on the internet. Below are some examples. If you see one listed for your branch, check how much the running times and service patterns have changed between then and now. You might be surprised!- Babylon Branch, 1978 (PDF, 15 MB) from lexciestuff.net
- Eastern Long Island (Patchogue/Montauk and Greenport), 1978 (PDF, 13 MB) from lexciestuff.net
- Oyster Bay Branch, 1976 (JPG) from Derek Stadler
- ALL stations and branches, 1997 from LIRR's old website on the Internet Archive
- Various old timetables, from Steve Lynch's LIRR archive
The issue of improving train speeds is a very complex one, and in this area, the subway and the railroads are apples and oranges when it comes to viable approaches to improving speeds. Nevertheless, it's a topic that should be addressed head on, and (pardon the pun) at great speed.
Before beginning, it’s important to differentiate between maximum speeds and average speeds. Both are important, but impact how long a train takes to get from point A to point B in different ways. Increasing maximum speeds can improve travel times, but it is only one part of the equation...there are a number of factors that can result in trains operating well below Maximum Authorized Speed (MAS) over the course of their trip, including the track, civil speed restrictions, signaling systems, the number of stops (including dwell time), schedule padding, and other scheduling deficiencies. Improving train speeds requires a holistic approach and should involve more than just increasing top speeds on certain segments of track.
Think of it this way: the local residential streets around your house typically have a speed limit of about 30 mi/hr. Your municipality can come and increase the speed limit to 80 mi/hr, but if there are stop signs or traffic lights at every block that you have to decelerate, stop, and accelerate again for each one, or if there are sharp curves or turns all over the place, the chances of you ever getting up to that 80 mi/hr speed are very slim.
Interactive map: LIRR speed limits
To get an idea of what timetable speed limits are like today, you can check out The LIRR Today's speed limit map. I'll stress that the map is presented as-is and for informational purposes only. The map is based on data from around 2012 and while timetable speeds have likely changed very little since then, no representations are made as to its accuracy today.The following sections outline a couple of the many factors that influence train speeds on mainline railroads in the United States, and some areas where there might be room for improvement... I will try to stay brief and summary-level for the purposes of this piece, and go into more detail in some of these areas in the coming weeks.
Civil speeds
Federal Railway Administration (FRA) regulations are one of the primary factors governing track speeds on mainline railroads in the United States.Straight track
49 CFR §213.9 sets maximum operating speeds for different “classes” of track, based on certain design and maintenance standards. For example, passenger trains track operating on tracks designed and maintained to "Class 4" standards can run at speeds of up to 80 mi/hr, while they can only go as fast as 60 mi/hr on "Class 3" track.
| Track class | MAS for freight trains | MAS for passenger trains |
|---|---|---|
| Excepted track | 10 mi/hr | N/A |
| Class 1 track | 10 mi/hr | 15 mi/hr |
| Class 2 track | 25 mi/hr | 30 mi/hr |
| Class 3 track | 40 mi/hr | 60 mi/hr |
| Class 4 track | 60 mi/hr | 80 mi/hr |
| Class 5 track | 80 mi/hr | 90 mi/hr |
| Class 6 track | 110 mi/hr | |
| Class 7 track | 125 mi/hr | |
| Class 8 track | 160 mi/hr | |
| Class 9 track | 220 mi/hr |
Various regulations set standards for track design and maintenance, and a segment of track must meet all of the requirements for a particular class to operate at those speeds. For example, 49 CFR §213.53 sets requirements for track gauge (the space between the heads of the rails cannot exceed 4 ft 9 3/4 in for class 2 and 3 track, but can be no more than 4 ft 9 1/2 in for class 4 and 5 track). Special requirements apply for tracks to be designated class 6 or above.
Interactive map: LIRR track maintenance classes
The NYS DOT maintains information on all active railroad lines in New York State, including the track class. I’ve extracted the relevant segments from their GIS shapefiles for Long Island and the Hudson Valley, and plotted them on a map you can find at this link. This can give you a general idea of which tracks are designated class 2, 3, 4, etc., although I wouldn’t put too much faith in it. While this is an official state government resource, there are several discrepancies that readily jump off the screen (including it showing two Main Line tracks west of Jamaica as class 2 track, when trains routinely operate at class 3 or 4 speeds)...but it can give you the gist of it.FRA regulations set maximum allowed speeds for different track classes, but railroads are free to deviate downwards. To reduce travel times, the LIRR or Metro-North have some flexibility to increase speeds up to the maximum limits shown in the table above...but to go beyond that they would have to improve the track to meet all of the requirements for the next class, or seek a waiver.
Upgrading track class: worth the expense?
While top speed improvements generally don't deliver all that much value for the expense involved, on very straight runs with few speed restrictions and lots of express trains, upgrading track to meet the requirements of a higher class (e.g. to permit speeds of 90 mi/hr or even 110 mi/hr) can have benefits. On the Montauk Branch between Jamaica and Wantagh, for example, increasing MAS from 80 mi/hr to 90 mi/hr (leaving all other speed restrictions the same) would save about 36 seconds on an express run. Increasing MAS to 110 mi/hr would reduce travel times by about 1 minute, 10 seconds. On the Main Line from Jamaica to Hicksville, improving MAS to 110 mi/hr would save about 2 minutes, 13 seconds on an express run. While that might not be a whole lot of time, stepping up track maintenance efforts to meet the requirements of a higher track class also has the benefit of bringing with it tracks that are smoother and maintained more intensively, which reduces the chances of disruptions or delays due to track failures.
While top speed improvements generally don't deliver all that much value for the expense involved, on very straight runs with few speed restrictions and lots of express trains, upgrading track to meet the requirements of a higher class (e.g. to permit speeds of 90 mi/hr or even 110 mi/hr) can have benefits. On the Montauk Branch between Jamaica and Wantagh, for example, increasing MAS from 80 mi/hr to 90 mi/hr (leaving all other speed restrictions the same) would save about 36 seconds on an express run. Increasing MAS to 110 mi/hr would reduce travel times by about 1 minute, 10 seconds. On the Main Line from Jamaica to Hicksville, improving MAS to 110 mi/hr would save about 2 minutes, 13 seconds on an express run. While that might not be a whole lot of time, stepping up track maintenance efforts to meet the requirements of a higher track class also has the benefit of bringing with it tracks that are smoother and maintained more intensively, which reduces the chances of disruptions or delays due to track failures.
Curve speeds
In terms of delivering travel time reductions on the railroads, in general, improving speeds on curves delivers the best bang for the buck. Permanent speed restrictions for curves can be killers...the track can otherwise be suitable for operation at 80 mi/hr or even more, but the introduction of a curve requires trains to decelerate from track speed early enough that they are moving no faster than the speed restriction by time they enter the curve, and then once they transit through the curve, accelerate back up to MAS. This time penalty, particularly the time lost decelerating and accelerating, can be a killer since it requires trains to break their stride and momentum, even for smaller curves.
Speeds on curves are also governed by FRA regulations, in this case 49 CFR §213.57. Most curve speed restrictions are rooted in the following equation: [(Ea + Eu)/(0.0007D)]1/2, where Ea is the superelevation or cant of the outside rail, Eu is the cant deficiency, and D is the degree of curvature, in degrees. Appendix A to 49 CFR 213 has tables outlining maximum allowed speeds over curves based on this equation.
To improve speeds on curves, railroads can do one of three things:
- Straighten the curve, decreasing the curve radius
- Increase the superelevation of the curve (e.g. raising the outer rail higher than the inner rail)
- Use a larger cant deficiency...since 2009, FRA regulations allow conventional trains up to 3 inches of cant deficiency, and railroads can apply for a waiver to operate above that on a per-vehicle basis (generally up to a point where the car can unload the inside wheel on the car by 60% of the static loading). In France and Germany, cant deficiencies of up to 6 inches are common on conventional trains, and 6 inches is generally considered the upper limit of what passengers feel comfortable at
Supersizing superelevation
In the case of LIRR and Metro-North, straightening curves is generally not a viable option in places where the surrounding areas are built up tight to the tracks and the right-of-way is narrow. There can also be topographical constraints limiting a straighter alignment.
Increasing superelevation and cant deficiency are better alternatives. Increasing the superelevation of curves to the maximum extent possible, wherever possible is the most viable way to improve speeds through curves from the civil aspect of the issue. With superelevation, inches can make a huge difference how fast a train can traverse a curve. For example, on a 5° curve with no superelevation, train speeds cannot exceed 29 mi/hr. But if the superelevation is increased to 6 inches (with all else remaining the same), the train could travel as fast as 51 mi/hr. On an 1,800 ft curve, that would save about 32 seconds, including acceleration penalties. If the cant deficiency was increased to 6 inches, the same curve could handle trains at 41 mi/hr, which would save 20 seconds. If both the superelevation and cant deficiency were increased, the train could travel at 59 mi/hr, which would save 40 seconds.
In the case of LIRR and Metro-North, straightening curves is generally not a viable option in places where the surrounding areas are built up tight to the tracks and the right-of-way is narrow. There can also be topographical constraints limiting a straighter alignment.
![]() |
| Straightening curves can require acquiring amounts of land, or building over difficult terrain. |
![]() |
| Forces at play with trains on superelevated tracks (Z22) |
Throughout this I'll stress how much seconds matter—while a 32 second or 40 second time savings on one curve might not sound like much, when you add up 32 seconds on a curve here, 40 seconds on a curve there, 5 seconds of dwell time savings at every stop, etc. all that adds up very quickly. Seconds can easily translate into minutes saved per trip, and hours saved per passenger over the course of a year. 32 seconds of time savings on a single curve adds up to about 4.5 fewer hours spent travelling by a weekday commuter over the course of a year. So, seconds matter very much...
That said, increasing superelevation many not always be feasible or practical. Stations are a good example of this...sitting stationary on a train while it's on a superelevated curve can be unpleasant for riders, and for every inch of additional superelevation, the gap between the train and the outside platform increases by an inch. At stations like Syosset, this can make already large gaps even larger, which can pose safety issues (though this could be mitigated with gap fillers).
When it comes to increasing curve speeds, it's important to focus on improving speeds over curves in areas where it would deliver the most benefit. In places where trains are already not typically travelling at track speed (e.g. immediately before and after stations) increasing curve speeds doesn't necessarily provide all that much bang for the buck, because trains are already operating at less than track speed. Examples include the curves next to Lynbrook on the Long Beach Branch, Lakeview on the West Hempstead Branch, and Kings Park on the Port Jefferson Branch, etc... But improving speeds on curves between stations or in areas where there are often express trains (e.g. the split between the Main Line and Central Branch near Bethpage, the split between the Montauk and Atlantic Branches near Laurelton, etc.) can deliver better travel time improvements.
The human factor
Another important aspect of train speeds is the human factor. All train crews in the US today are humans, and so are imperfect and liable to error. There's nothing inherently wrong with that, but given the incredible consequences of trains going overspeed, railroads take speeding very seriously (and rightfully so). Because of that, train crews may not push trains all the way up to MAS, but cruise a safe margin below it. If the MAS is 80 mi/hr, you will very rarely see crews running at 79.9 mi/hr, in the odd event that they coast downhill and pick up a little more speed or if someone is standing on the side of the tracks with a radar gun that’s calibrated slightly differently from the train’s speedometer.And railroads, knowing that humans aren’t perfect, will build a cushion into maximum speeds so if a train does wind up going a little too fast, it doesn’t catastrophically derail at 80.01 mi/hr. The same practice is applied to an even greater extent in highway engineering…a road may be signed for a 55 mi/hr limit, but the design speed is actually 70 mi/hr or higher, because we know everyone speeds. And while speeding is bad, most people do it, and it doesn’t necessarily cause disaster every time.
Reducing the impact of the human factor
Positive Train Control should help both of these factors… Since train crews can take an extra level of comfort in knowing that PTC will step in and regulate train speeds if they go too fast, in most cases, they can get into the habit of pushing closer to MAS (and train crews should be retrained in the area of more aggressive train handling post-PTC). Further, if PTC will actively enforce speeds and step in to slow a train before it reaches a curve or a slower segment, railroads can reduce that extra cushion and let trains run closer to the design speed of the track or curve.
Positive Train Control should help both of these factors… Since train crews can take an extra level of comfort in knowing that PTC will step in and regulate train speeds if they go too fast, in most cases, they can get into the habit of pushing closer to MAS (and train crews should be retrained in the area of more aggressive train handling post-PTC). Further, if PTC will actively enforce speeds and step in to slow a train before it reaches a curve or a slower segment, railroads can reduce that extra cushion and let trains run closer to the design speed of the track or curve.
![]() |
| Signs like these are usually only used in advance of permanent speed restrictions (Photo: The LIRR Today) |
This issue can be amplified by vague or unclear language in the Special Instructions that don't give specific start and end points. The Special Instructions are an appendix of sorts to the employee working timetable that lay out a host of rules, policies, and procedures that train crews must adhere to. While some cases provide specific signals, crossings, or other landmarks where restrictions start or end that are easily identifiable, many are general, like restrictions for "reverse curves east of St. Albans" or "first curve west of Syosset"...and while that gets the message across, it doesn't define precise start or end points for the restrictions. Train crews have to know all of this down to the minute detail as part of qualifying on a segment of track, so it is likely not a significant source of lost time, but it can be a factor. Metro-North's timetable defines speed restrictions using mileposts, down to the tenth of a mile, though that also has practicality and resolution limits (physical mileposts are stationed, at best, only once per mile, and you can lose time for speed restrictions that start between tenths of a milepost).
Eliminating the gray area
The issue of train crews not knowing exactly where speed limits change can be mitigated with better wayside signage, including signs informing train crews of all speed limit changes (whether restrictions or ordinary changes to track speed), both before and at any change in speed. Railroads can also use car markers to further define locations, so a 6-car train can begin accelerating to track speed sooner than a 12-car train. As far as I’m aware, LIRR does this only in one location—heading eastbound into the East River Tunnels from NY-Penn Station. They are not the typical orange-on-blue markers you see at most stations, but they are there in yellow text on the right-hand side. These markers indicate to train crews exactly when they are clear of the interlocking and can accelerate to track speed, which helps keep trains moving and maximizing capacity. Speed signs should be installed any place the speed changes, but this next level with the car markers should also be considered in any place where there is a nontrivial speed increase, or the boundaries are often confused.
![]() |
| Car markers in the East River Tunnels indicate to train crews when it is safe to accelerate up to track speed. |
There are also limitations to human memory that result in railroads "rounding down" train speeds. On a curve, for example, you could plug all of your parameters into the equation above and get a MAS of 29.14765 mi/hr, but nobody can practically remember that for dozens of locations, so the speed limit is rounded down to 25 mi/hr for ease of use. Both LIRR and Metro-North provide speed limits only in increments of 5 mi/hr.
Using these methods to modify behavior and improve communication can help increase average speeds at a fairly low cost, without having to put any shovels in the ground or change track geometry...
Signal system constraints
Physical track geometry is just one component of train speeds...the signal system can unduly slow trains as well. While the principle use of the signal system is to regulate train spacing, it can also have both unintentional and intentional impacts on train speeds. Like the human factors, there are limitations on what resolution the signal system can govern (which includes LIRR's Automated Speed Control cab signalling system).While the LIRR has a great many wayside signal indications that train crews must be aware of, they all really boil down to communicating to train crews to move at one of just four speeds. While there are exceptions (there are no shortage of exceptions in LIRR's operating rules), in general, those four speeds translate to the following:
- Normal speed (MAS, determined by the civil and regulatory parameters above)
- Medium speed (generally 30 mi/hr, but can be up to 40 mi/hr in ASC territory if shown on the cab signal indicator)
- Slow speed (generally 15 mi/hr, but can be up to 30 mi/hr in ASC territory if shown on the cab signal indicator)
- Restricted speed (15 mi/hr or a speed that allows the train to stop within half the sight distance, whichever is less)
Slow speed and restricted speed are more or less the same thing, so it's really down to one of three options: MAS, 30 mi/hr, or a crawl. That's about it. In Zone A (Amtrak territory) and on Metro-North, there are additional limited speed indications (which is 40 mi/hr on LIRR, 45 mi/hr on Amtrak and Metro-North). All of the different permutations of these indications are to communicate multiple messages to train crews (e.g. most indications tell crews three things: (1) how fast to go now, (2) how fast to go when clear of the interlocking, and (3) how fast to go as they approach the next signal).
This can unduly slow train speeds, because if the signal can't display a normal speed indication, the next best it can go is medium speed (or limited speed on Amtrak/Metro-North). These impacts have been exacerbated by using the signal system to enforce train speeds in some areas, largely as a consequence of the Spuyten Duyvil Metro-North train derailment and subsequent Emergency Order 29 (which LIRR got caught up in to some extent as well). Metro-North failed to prevent the derailment because its cab signalling system did not have any facilities in place to restrict train speeds over curves—in fact, as I wrote back in 2013, Metro-North's cab signalling system largely did not do anything to enforce any speed limits, instead it would only step in and stop the train once it exceeded the overall MAS by 3 mi/hr or more (in this case, it would have only stepped in to stop the train if it was going 93 mi/hr or faster, when the speed limit was 30 mi/hr). In response to this, FRA ordered Metro-North (and this was later expanded to LIRR) to make modifications to its existing cab signal system, effectively tricking it to display slower speed indications in cases where there were significant changes in speed limits. So, for example, on the Spuyten Duyvil curve, the cab signal system would be tricked to downgrading the signal indication to medium (30 mi/hr), regardless of whether the track ahead of it was occupied. With a medium indication, the speed control system would step in to stop the train at a much lower threshold.
![]() |
| A medium clear signal is displayed to force trains slower, even though the track ahead is clear. |
The LIRR's ASC system is a bit more flexible...the ASC can communicate one of six different codes to train crews (on the MU's it's 80, 70, 60, 40, 30, 15; on the diesels it's 80, 65, 55, 40, 30, 15). That does allow for better granularity, but it still doesn't cover everything considering LIRR has speed limits divisible by pretty much every unit of 5 mi/hr from 5 mi/hr to 80 mi/hr. Metro-North's system has just four indications: N, L, M, R (for normal, limited, medium, and restricting, defined above).
Though even the ASC system can unduly constrain speeds. If ASC is used to enforce speed restrictions by giving trains a lower code through an area, the train is usually forced down for the entire block or track circuit which can force trains to run slower for some distance before and/or after the actual speed restriction. For example, on westbound trains approaching HALL and Jamaica from the Atlantic Branch, ASC forces trains down to 30 mi/hr (for the curve on the underpasses into HALL) so early, they down to the reduced speed before the head car reaches Liberty Avenue. Train crews not wanting to jostle passengers will begin slowing down even before that, resulting in trains operating below MAS well before the actual curve starts.
In this area, the LIRR and Metro-North lag significantly behind. The M-7 fleet was specified with an acceleration of about 3.0 ft/s2, but when the equipment encountered power draw problems during testing, the acceleration was downgraded to avoid overloading the power infrastructure. Some reports indicate that the new cars were downgraded to cut the acceleration rate roughly in half, to as low as 1.5 ft/s2, though in most cases I have observed in-service acceleration rates typically ranging between 1.5 ft/s2 and 2.0 ft/s2... In practice actual acceleration rates seem much more parabolic, decreasing as speed picks up. The M-7's decelerate at a rate of about 4.3 ft/s2 in service braking and about 4.6 ft/s2 in emergency. The M-8's are only slightly better than that. Early indications with the new M-9 fleet strongly suggest the new cars do not represent any improvement in acceleration over the older M-7 fleet. If anything, they are a bit more sluggish in that final push to get from 60 mi/hr up to 80 mi/hr.
The figure below shows velocity-vs-time curves for a number of example M-7 (light blue) and M-9 (orange) trips measured over the last few weeks. In all of these cases, trains were accelerating from a dead stop up to track speed in 80 mi/hr territory, unencumbered. The acceleration is the derivative (slope) of these lines. In general, I'll assume a best-fit constant acceleration rate of 1.5 ft/s2 for the MTA's pre-modern fleets (the M-7, M-8, M-9 fleets). That line is shown in dark blue.
Modern European EMU's have much better rates of acceleration. A typical modern EMU has an acceleration of about 4 ft/s2, which is more than twice as good as the MTA's pre-modern M-7, M-8, and M-9 fleets. The importance of this is explained further in a post about the value of modern EMU's that appeared first on Pedestrian Observations.
Poor acceleration can have a major impact on door-to-door travel times. Just starting from a station stop, the MTA's slower-accelerating pre-modern EMU's take at least 45 seconds longer to get up to 80 mi/hr than modern European EMU's. The figure at the right compares train speed vs. time for the acceleration on the MTA's pre-modern EMU fleets (the M-7, M-8, M-9 fleets) and a modern European EMU. Trains incur these additional acceleration penalties not just accelerating from a stop, but at any change in speed. So if a train does have to slow for a curve, it also continues to lose time after the train completely clears the curve, as it works its way accelerating back up to top speed.
In many cases, poor acceleration has such a big impact that many trains never even get able to reach track speed before they have to begin slowing down for their next station or a later speed restriction. Take the example in the figure below for a Babylon local train. Despite the train operating entirely in 80 mi/hr territory, with no other trains ahead, this train doesn't reach MAS at any point during its trip while making local stops. Because it takes the M-7 equipment so long to get up track speed, it can only make it to about 60 mi/hr before it has to start decelerating for its next station stop.
And all of this has been about the MTA's pre-modern EMU fleets (particularly LIRR's M-7's and M-9's). Acceleration and braking rates on the diesels are even worse! So these impacts are even more acute in diesel territory, especially on the Oyster Bay and Port Jefferson where there are a ton of curve-related speed restrictions.
Because of the very sluggish acceleration rates, and the generally dense stop spacing on the LIRR and Metro-North, I contend that improving overall top speeds is not the most pressing need, but rather the first derivative of speed—train acceleration rates.
Schedule padding is extra time intentionally built into train schedules so that a train can fall behind schedule slightly but make up that time, so there is less of a chance of it being counted as late in on-time performance statistics. For example, if it actually takes 3 minutes for a train to travel from station A to station B, the railroad will schedule the trip for 4 minutes instead, so there is a bit of slack in the schedule in the event the train is running late (in this case, if a train leaves station A six minutes late, it can arrive station B only five minutes late, and be counted as on time). While this builds in extra slack and allows for trains to make up time, schedule padding prolongs door to door travel times and reduces overall average speeds, since trains have to hold for their schedule or operate slower when the padding is not needed, to avoid running early.
Both railroads make extensive use of schedule padding. Metro-North's use of endpoint schedule padding is much more obnoxious—for example, on outbound trains that terminate in Stamford, Metro-North typically schedules 11 minutes for trains to make the 1.7 mile between Old Greenwich and Stamford, while inbound trains only take 3 minutes to travel the same distance in the reverse direction. The 1.2 mile journey between Brewster and Southeast is scheduled for for 15 minutes on most outbound Harlem Line trains terminating at Southeast, while trains in the reverse direction operating on the same tracks are scheduled for just 3 minutes. This variety of endpoint schedule padding is an obvious and bad-faith ploy to inflate on-time performance statistics...in the case of the outbound Harlem Line train to Southeast above, the train can arrive every one of its stations through Brewster as much as 17 minutes late—meaning that the vast majority of passengers onboard arrived their destinations late—and the train can leave Brewster 17 minutes late...but then because the 3-minute trip to Southeast is scheduled for 15 minutes (12 extra minutes of schedule padding), the train arrives Southeast 5 minutes late, and Metro-North counts the entire trip as on-time. Railroads can get away with this because the current method of calculating OTP makes it easy for railroads to play these tricks and inflate OTP in a way that other metrics (like passenger-weighted OTP or passenger hours delayed) does not.
Metro-North is by no means the only railroad to play these tricks with endpoint schedule padding (though they do have some pretty egregious examples), though that doesn't make it ok. The LIRR generally doesn't engage in this practice all that much—though they are starting to...as part of "LIRR Forward" the railroad said it identified the most frequently delayed trains and made adjustments, though in almost all of these cases that was just adding a couple minutes of endpoint schedule padding.
For the purposes of the discussion of train speeds, endpoint schedule padding doesn't make that big of a deal...it's easy to detect, and doesn't really impact passenger travel times...it's just a trick railroads play to artificially inflate OTP metrics. What is more serious, in this context, is all of the inline schedule padding added to train schedules enroute. This type of schedule padding requires trains to routinely operate slower than they otherwise could given the speed limit in a particular area, that way they do not run ahead of schedule and either leave stations early (causing people to miss their train), or run out of slot/sequence, which can cause delays to other trains.
In order to determine how much time in LIRR's schedules is actual running time vs. schedule padding, I analyzed data from the LIRR's GTFS-RT feed over the course of a little more than a year to determine what actual running times between stations are. The GTFS-RT feed reports OTP on arrival at scheduled station stops down to the second, which makes it possible to calculate the raw running time for a particular train travelling between two stations.
The results of this running time analysis are shown in the table below. The raw running time is considered the actual, bare-minimum time it takes for a train to go from the first station to the second station. Actual running times were determined by comparing reported OTP to scheduled running times to determine the amount of time (to the second) it took a train to go from arriving at the first station to arriving at the second station (so all of these figures are inclusive of dwell time at the first station, except for Jamaica where it includes only dwell time beyond what is already scheduled). A time is only counted if there is a valid timing at both ends of the station pair. In all cases, the running times shown are determined only from trains that make that exact stopping pattern...e.g. the raw running time for Mineola to Westbury is calculated only based on trains that run express from MIN to WBY, and is not the sum of MIN to CPL + CPL to WBY, or WBY to MIN in the reverse direction.
In order to account for potential errors in the data (intentional or otherwise) the top 1% fastest results between each station pair were discarded. The raw running times are additionally controlled by the timetable speeds between the two stations (e.g. the raw running time can't be a time that would require the train to operate at 100 mi/hr or some other speed over the limit). But other than these two controls, the data presented below is shown exactly as it was represented on the LIRR's data feed.
In the table below, the blue columns represent how long the LIRR typically schedules trains to travel between the two points indicated (plus the minimum amount of time trains are scheduled to go between the two), and the green columns represent the actual running times, as determined from the real-time data. The average and 75th percentile running times are shown in addition to the raw running time (99th percentile).
Though even the ASC system can unduly constrain speeds. If ASC is used to enforce speed restrictions by giving trains a lower code through an area, the train is usually forced down for the entire block or track circuit which can force trains to run slower for some distance before and/or after the actual speed restriction. For example, on westbound trains approaching HALL and Jamaica from the Atlantic Branch, ASC forces trains down to 30 mi/hr (for the curve on the underpasses into HALL) so early, they down to the reduced speed before the head car reaches Liberty Avenue. Train crews not wanting to jostle passengers will begin slowing down even before that, resulting in trains operating below MAS well before the actual curve starts.
Mitigating the impacts of signal system constraints
Positive Train Control will help with this. As part of PTC, the LIRR's existing aspect display units are getting swapped out with new ones that have ten aspects (80, 70, 65, 60, 55, 45, 40, 30, 20, 15). And PTC will not necessarily be limited strictly to the confines of existing blocks or track circuits, since it will better know the exact location of a train within a block or circuit. The LIRR's move towards Reduced Aspect Signalling will help, too, as speeds are not limited to the three speeds the full signals can display. Instead, RAS has a "proceed" indication that tells train crews to go at whatever speed the cab signal system says (using that to downgrade speeds, if necessary), and the cab signal system has the 6 or 10 different speed indications. In this area, expediting the transition to RAS would help.
When PTC finally comes online, the LIRR and Metro-North should make sure to go back and undo all of these "ghost signal" tricks so wayside signals are not unduly limiting train speeds, and instead let PTC do its job and enforce speeds in cases like these. This is just another item on a long list of present day situations made worse by the railroads not implementing PTC in a timely manner...
Positive Train Control will help with this. As part of PTC, the LIRR's existing aspect display units are getting swapped out with new ones that have ten aspects (80, 70, 65, 60, 55, 45, 40, 30, 20, 15). And PTC will not necessarily be limited strictly to the confines of existing blocks or track circuits, since it will better know the exact location of a train within a block or circuit. The LIRR's move towards Reduced Aspect Signalling will help, too, as speeds are not limited to the three speeds the full signals can display. Instead, RAS has a "proceed" indication that tells train crews to go at whatever speed the cab signal system says (using that to downgrade speeds, if necessary), and the cab signal system has the 6 or 10 different speed indications. In this area, expediting the transition to RAS would help.
When PTC finally comes online, the LIRR and Metro-North should make sure to go back and undo all of these "ghost signal" tricks so wayside signals are not unduly limiting train speeds, and instead let PTC do its job and enforce speeds in cases like these. This is just another item on a long list of present day situations made worse by the railroads not implementing PTC in a timely manner...
Slow acceleration and deceleration
Vince Lombardi once said “it's not whether you got knocked down; it's whether you get back up”...try as we might, there's simply no way to straighten every curve or improve every track to achieve top speeds. While many civil speed limitations are inevitable, railroads can mitigate the impact they have by maximizing train acceleration, that way even if a train gets knocked down from MAS due to a restriction, it can get back up to MAS as quickly as possible after clearing the restriction, to minimize the impact to the schedule. Here, acceleration, not velocity, is the most important factor. The faster a train can accelerate (the rate of change of velocity), the faster the train can get up to top speed.In this area, the LIRR and Metro-North lag significantly behind. The M-7 fleet was specified with an acceleration of about 3.0 ft/s2, but when the equipment encountered power draw problems during testing, the acceleration was downgraded to avoid overloading the power infrastructure. Some reports indicate that the new cars were downgraded to cut the acceleration rate roughly in half, to as low as 1.5 ft/s2, though in most cases I have observed in-service acceleration rates typically ranging between 1.5 ft/s2 and 2.0 ft/s2... In practice actual acceleration rates seem much more parabolic, decreasing as speed picks up. The M-7's decelerate at a rate of about 4.3 ft/s2 in service braking and about 4.6 ft/s2 in emergency. The M-8's are only slightly better than that. Early indications with the new M-9 fleet strongly suggest the new cars do not represent any improvement in acceleration over the older M-7 fleet. If anything, they are a bit more sluggish in that final push to get from 60 mi/hr up to 80 mi/hr.
The figure below shows velocity-vs-time curves for a number of example M-7 (light blue) and M-9 (orange) trips measured over the last few weeks. In all of these cases, trains were accelerating from a dead stop up to track speed in 80 mi/hr territory, unencumbered. The acceleration is the derivative (slope) of these lines. In general, I'll assume a best-fit constant acceleration rate of 1.5 ft/s2 for the MTA's pre-modern fleets (the M-7, M-8, M-9 fleets). That line is shown in dark blue.
Modern European EMU's have much better rates of acceleration. A typical modern EMU has an acceleration of about 4 ft/s2, which is more than twice as good as the MTA's pre-modern M-7, M-8, and M-9 fleets. The importance of this is explained further in a post about the value of modern EMU's that appeared first on Pedestrian Observations.
Poor acceleration can have a major impact on door-to-door travel times. Just starting from a station stop, the MTA's slower-accelerating pre-modern EMU's take at least 45 seconds longer to get up to 80 mi/hr than modern European EMU's. The figure at the right compares train speed vs. time for the acceleration on the MTA's pre-modern EMU fleets (the M-7, M-8, M-9 fleets) and a modern European EMU. Trains incur these additional acceleration penalties not just accelerating from a stop, but at any change in speed. So if a train does have to slow for a curve, it also continues to lose time after the train completely clears the curve, as it works its way accelerating back up to top speed.
In many cases, poor acceleration has such a big impact that many trains never even get able to reach track speed before they have to begin slowing down for their next station or a later speed restriction. Take the example in the figure below for a Babylon local train. Despite the train operating entirely in 80 mi/hr territory, with no other trains ahead, this train doesn't reach MAS at any point during its trip while making local stops. Because it takes the M-7 equipment so long to get up track speed, it can only make it to about 60 mi/hr before it has to start decelerating for its next station stop.
And all of this has been about the MTA's pre-modern EMU fleets (particularly LIRR's M-7's and M-9's). Acceleration and braking rates on the diesels are even worse! So these impacts are even more acute in diesel territory, especially on the Oyster Bay and Port Jefferson where there are a ton of curve-related speed restrictions.
Because of the very sluggish acceleration rates, and the generally dense stop spacing on the LIRR and Metro-North, I contend that improving overall top speeds is not the most pressing need, but rather the first derivative of speed—train acceleration rates.
Improving train acceleration
How can LIRR and Metro-North improve train acceleration? Well, the most blunt answer is: buy better trains. An off-the-shelf European EMU will accelerate at at least twice the rate as the MTA's current fleets. It is extremely disappointing to see the M-9's come fresh out of the box and have the same problems with poor acceleration as the M-7's did, despite costing us 23% more per car for basically the same design.
The simplest distillation of the issue of acceleration is that it's a function of the force needed to propel a train from stop and the train's mass. To improve acceleration, railroads can either increase the force being applied (by specifying larger and more powerful traction motors) or decreasing the mass of the train. Decreasing mass is quite achievable in LIRR and Metro-North's case...the MTA's pre-modern EMU's are extremely heavy. The M-7 fleet, for example, is 32% heavier than modern EMU's built to Euronorms (once adjusted for train length effects). Dramatically reducing car weights by seeking alternative compliance under new FRA passenger equipment safety standards would be an obvious way to achieve this.
Increasing the forces applied can be an alternative too, but there are practical limitations to the size and power of electric traction motors (and diesel engines have even further limitations). These limitations come both in terms of size and cost, but also, more importantly, energy consumption. Larger motors consume more power, and the power infrastructure required to support that has its limitations, too. On both LIRR and Metro-North, the railroads could improve power facilities to at least let the M-7's perform much closer to their design acceleration of 3.0 ft/s2, instead of half that...that will get us a lot of the way there. Systemwide power upgrades are not unprecedented...in the 1960's, the LIRR undertook a wholesale upgrade of its traction power systems across its entire electrified territory (including by increasing the supply voltage from 650 V DC to 750 V DC) in advance of the arrival of the M-1 fleet, in order to take full advantage of the new cars' improved performance.
Expanding electrification is also critical. The diesel fleets accelerate even slower than the MTA's already sluggish pre-modern EMU's, and even the best and most high-performing conventional locomotive-hauled trains will not come even close to the performance of a modern EMU. The MTA could pursue Diesel Multiple Units (DMU's) or Hydrogen-powered Multiple Units (HMU's) for unelectrified territory (as even these represent a substantial improvement over locomotive-hauled trains), but when it comes to improving acceleration, there is no better bang for the buck than electrification.
While the LIRR and Metro-North can (and probably still should) sink a lot into power upgrades, the difference in performance between the existing fleets and modern European EMU's is so significant that the railroads should probably put that money towards expanding their current fleets with new, off-the-shelf, lightweight EMU's, starting immediately and with the ongoing M-9A procurement, and then look to accelerate the replacement of all of the pre-modern EMU fleets (the M-7's, M-8's, and, yes, even the M-9's) as soon as possible.
How can LIRR and Metro-North improve train acceleration? Well, the most blunt answer is: buy better trains. An off-the-shelf European EMU will accelerate at at least twice the rate as the MTA's current fleets. It is extremely disappointing to see the M-9's come fresh out of the box and have the same problems with poor acceleration as the M-7's did, despite costing us 23% more per car for basically the same design.
The simplest distillation of the issue of acceleration is that it's a function of the force needed to propel a train from stop and the train's mass. To improve acceleration, railroads can either increase the force being applied (by specifying larger and more powerful traction motors) or decreasing the mass of the train. Decreasing mass is quite achievable in LIRR and Metro-North's case...the MTA's pre-modern EMU's are extremely heavy. The M-7 fleet, for example, is 32% heavier than modern EMU's built to Euronorms (once adjusted for train length effects). Dramatically reducing car weights by seeking alternative compliance under new FRA passenger equipment safety standards would be an obvious way to achieve this.
Increasing the forces applied can be an alternative too, but there are practical limitations to the size and power of electric traction motors (and diesel engines have even further limitations). These limitations come both in terms of size and cost, but also, more importantly, energy consumption. Larger motors consume more power, and the power infrastructure required to support that has its limitations, too. On both LIRR and Metro-North, the railroads could improve power facilities to at least let the M-7's perform much closer to their design acceleration of 3.0 ft/s2, instead of half that...that will get us a lot of the way there. Systemwide power upgrades are not unprecedented...in the 1960's, the LIRR undertook a wholesale upgrade of its traction power systems across its entire electrified territory (including by increasing the supply voltage from 650 V DC to 750 V DC) in advance of the arrival of the M-1 fleet, in order to take full advantage of the new cars' improved performance.
Expanding electrification is also critical. The diesel fleets accelerate even slower than the MTA's already sluggish pre-modern EMU's, and even the best and most high-performing conventional locomotive-hauled trains will not come even close to the performance of a modern EMU. The MTA could pursue Diesel Multiple Units (DMU's) or Hydrogen-powered Multiple Units (HMU's) for unelectrified territory (as even these represent a substantial improvement over locomotive-hauled trains), but when it comes to improving acceleration, there is no better bang for the buck than electrification.
While the LIRR and Metro-North can (and probably still should) sink a lot into power upgrades, the difference in performance between the existing fleets and modern European EMU's is so significant that the railroads should probably put that money towards expanding their current fleets with new, off-the-shelf, lightweight EMU's, starting immediately and with the ongoing M-9A procurement, and then look to accelerate the replacement of all of the pre-modern EMU fleets (the M-7's, M-8's, and, yes, even the M-9's) as soon as possible.
Schedule padding
While the civil infrastructure and the signal system and train performance can have impacts on train speeds, the plain fact of the matter is that many LIRR and Metro-North trains run as slow as they do because the railroads schedule them to be that slow.Schedule padding is extra time intentionally built into train schedules so that a train can fall behind schedule slightly but make up that time, so there is less of a chance of it being counted as late in on-time performance statistics. For example, if it actually takes 3 minutes for a train to travel from station A to station B, the railroad will schedule the trip for 4 minutes instead, so there is a bit of slack in the schedule in the event the train is running late (in this case, if a train leaves station A six minutes late, it can arrive station B only five minutes late, and be counted as on time). While this builds in extra slack and allows for trains to make up time, schedule padding prolongs door to door travel times and reduces overall average speeds, since trains have to hold for their schedule or operate slower when the padding is not needed, to avoid running early.
Both railroads make extensive use of schedule padding. Metro-North's use of endpoint schedule padding is much more obnoxious—for example, on outbound trains that terminate in Stamford, Metro-North typically schedules 11 minutes for trains to make the 1.7 mile between Old Greenwich and Stamford, while inbound trains only take 3 minutes to travel the same distance in the reverse direction. The 1.2 mile journey between Brewster and Southeast is scheduled for for 15 minutes on most outbound Harlem Line trains terminating at Southeast, while trains in the reverse direction operating on the same tracks are scheduled for just 3 minutes. This variety of endpoint schedule padding is an obvious and bad-faith ploy to inflate on-time performance statistics...in the case of the outbound Harlem Line train to Southeast above, the train can arrive every one of its stations through Brewster as much as 17 minutes late—meaning that the vast majority of passengers onboard arrived their destinations late—and the train can leave Brewster 17 minutes late...but then because the 3-minute trip to Southeast is scheduled for 15 minutes (12 extra minutes of schedule padding), the train arrives Southeast 5 minutes late, and Metro-North counts the entire trip as on-time. Railroads can get away with this because the current method of calculating OTP makes it easy for railroads to play these tricks and inflate OTP in a way that other metrics (like passenger-weighted OTP or passenger hours delayed) does not.
Metro-North is by no means the only railroad to play these tricks with endpoint schedule padding (though they do have some pretty egregious examples), though that doesn't make it ok. The LIRR generally doesn't engage in this practice all that much—though they are starting to...as part of "LIRR Forward" the railroad said it identified the most frequently delayed trains and made adjustments, though in almost all of these cases that was just adding a couple minutes of endpoint schedule padding.
For the purposes of the discussion of train speeds, endpoint schedule padding doesn't make that big of a deal...it's easy to detect, and doesn't really impact passenger travel times...it's just a trick railroads play to artificially inflate OTP metrics. What is more serious, in this context, is all of the inline schedule padding added to train schedules enroute. This type of schedule padding requires trains to routinely operate slower than they otherwise could given the speed limit in a particular area, that way they do not run ahead of schedule and either leave stations early (causing people to miss their train), or run out of slot/sequence, which can cause delays to other trains.
In order to determine how much time in LIRR's schedules is actual running time vs. schedule padding, I analyzed data from the LIRR's GTFS-RT feed over the course of a little more than a year to determine what actual running times between stations are. The GTFS-RT feed reports OTP on arrival at scheduled station stops down to the second, which makes it possible to calculate the raw running time for a particular train travelling between two stations.
The results of this running time analysis are shown in the table below. The raw running time is considered the actual, bare-minimum time it takes for a train to go from the first station to the second station. Actual running times were determined by comparing reported OTP to scheduled running times to determine the amount of time (to the second) it took a train to go from arriving at the first station to arriving at the second station (so all of these figures are inclusive of dwell time at the first station, except for Jamaica where it includes only dwell time beyond what is already scheduled). A time is only counted if there is a valid timing at both ends of the station pair. In all cases, the running times shown are determined only from trains that make that exact stopping pattern...e.g. the raw running time for Mineola to Westbury is calculated only based on trains that run express from MIN to WBY, and is not the sum of MIN to CPL + CPL to WBY, or WBY to MIN in the reverse direction.
In order to account for potential errors in the data (intentional or otherwise) the top 1% fastest results between each station pair were discarded. The raw running times are additionally controlled by the timetable speeds between the two stations (e.g. the raw running time can't be a time that would require the train to operate at 100 mi/hr or some other speed over the limit). But other than these two controls, the data presented below is shown exactly as it was represented on the LIRR's data feed.
In the table below, the blue columns represent how long the LIRR typically schedules trains to travel between the two points indicated (plus the minimum amount of time trains are scheduled to go between the two), and the green columns represent the actual running times, as determined from the real-time data. The average and 75th percentile running times are shown in addition to the raw running time (99th percentile).
Explore the data: Running time analysis
You can view the full data table at this link.| From | to | eq | Sample size | Average Schedule | Min schedule | Average run time | 75%tile run time | raw running time | Sched. padding | |
| ABT | EWN | d | 5,479 | 3 | 3 | 2.8 | 2.6 | 1.8 | 41% | |
| ABT | RSN | d | 5,256 | 3 | 2 | 3.2 | 3.0 | 2.1 | 33% | |
| ADL | BDY | e | 11,634 | 2 | 2 | 1.9 | 1.8 | 1.4 | 35% | |
| ADL | BSD | e | 13,680 | 2 | 2 | 2.5 | 2.3 | 1.7 | 32% | |
| ADL | MHL | e | 1,964 | 4 | 4 | 3.1 | 2.9 | 2.6 | 35% | |
| ADL | WDD | e | 283 | 12 | 12 | 9.7 | 9.1 | 8.0 | 33% | |
| AGT | EHN | d | 2,027 | 5 | 5 | 4.8 | 4.3 | 3.8 | 29% | |
| AGT | MTK | d | 1,603 | 20 | 20 | 18.1 | 17.2 | 13.2 | 35% | |
| ATL | ENY | e | 1,129 | 11 | 10 | 11.3 | 10.8 | 9.8 | 8% | |
| ATL | JAM | e | 2,597 | 20 | 18 | 19.6 | 18.2 | 16.6 | 15% | |
| ATL | NAV | e | 20,239 | 6 | 6 | 7.2 | 6.7 | 5.7 | 12% | |
| ATL | WBY | e | 281 | 36 | 36 | 35.9 | 34.0 | 31.4 | 13% | |
| AVL | BTA | d | 1 | 10 | 10 | 11.8 | 11.8 | 11.8 | 0% | |
| AVL | BTA | e | 958 | 7 | 6 | 7.4 | 6.6 | 5.1 | 27% | |
| AVL | CPG | d | 2 | 3 | 3 | 2.8 | 2.7 | 2.5 | 16% | |
| AVL | CPG | e | 17,379 | 3 | 2 | 2.6 | 2.4 | 1.8 | 38% | |
| AVL | FPT | e | 549 | 11 | 9 | 9.8 | 8.8 | 7.9 | 25% | |
| AVL | JAM | e | 263 | 34 | 34 | 33.9 | 32.5 | 29.9 | 12% | |
| AVL | MPK | e | 16,142 | 3 | 2 | 3.2 | 3.0 | 2.3 | 21% | |
| AVL | MQA | d | 1 | 4 | 4 | 4.3 | 4.3 | 4.3 | 0% | |
| AVL | MQA | e | 858 | 4 | 4 | 4.0 | 3.8 | 3.4 | 17% | |
| AVL | WGH | e | 1,662 | 7 | 5 | 6.4 | 5.7 | 5.1 | 26% | |
| BDY | ADL | e | 12,026 | 2 | 2 | 2.1 | 2.0 | 1.4 | 29% | |
| BDY | BSD | e | 1,650 | 3 | 3 | 3.2 | 3.0 | 2.6 | 16% | |
| BDY | FLS | e | 2,228 | 3 | 3 | 3.3 | 3.1 | 2.7 | 13% | |
| BDY | MHL | e | 11,250 | 2 | 2 | 2.2 | 2.1 | 1.4 | 32% | |
| BHN | EHN | d | 2,291 | 10 | 10 | 8.8 | 8.4 | 7.0 | 31% | |
| BHN | SHN | d | 2,088 | 11 | 10 | 11.6 | 9.4 | 7.2 | 34% | |
| BK | PJN | d | 1,427 | 11 | 9 | 10.5 | 10.0 | 8.3 | 22% | |
| BK | SJM | d | 5,428 | 6 | 5 | 6.4 | 5.8 | 4.9 | 19% | |
| BMR | FPT | d | 1 | 5 | 5 | 4.8 | 4.8 | 4.8 | 3% | |
| BMR | FPT | e | 837 | 5 | 5 | 4.4 | 4.0 | 3.1 | 38% | |
| BMR | MQA | d | 1 | 8 | 8 | 8.6 | 8.6 | 8.6 | 0% | |
| BMR | MQA | e | 749 | 5 | 5 | 4.6 | 4.3 | 3.3 | 35% | |
| BMR | MRK | e | 17,956 | 3 | 3 | 2.7 | 2.5 | 1.9 | 36% | |
| BMR | WGH | d | 2 | 3 | 3 | 3.4 | 3.3 | 3.3 | 0% | |
| BMR | WGH | e | 17,186 | 3 | 2 | 2.6 | 2.4 | 1.6 | 46% | |
| BPG | BTA | d | 118 | 12 | 12 | 16.3 | 14.8 | 12.5 | 0% | |
| BPG | FMD | e | 11,371 | 5 | 4 | 4.7 | 4.3 | 3.3 | 33% | |
| BPG | HVL | d | 106 | 6 | 6 | 7.0 | 6.5 | 5.9 | 1% | |
| BPG | HVL | e | 11,018 | 6 | 4 | 5.8 | 5.2 | 4.3 | 23% | |
| BPG | JAM | e | 546 | 27 | 25 | 24.9 | 22.7 | 20.7 | 23% | |
| BPG | NYK | e | 252 | 50 | 48 | 47.6 | 45.5 | 29.3 | 41% | |
| BPT | MSY | d | 2,843 | 7 | 5 | 6.7 | 6.4 | 5.1 | 24% | |
| BPT | PD | d | 2,729 | 7 | 5 | 6.6 | 6.0 | 5.1 | 26% | |
| BRS | FPK | e | 10,621 | 2 | 2 | 1.9 | 1.8 | 1.5 | 30% | |
| BRS | JAM | e | 52 | 12 | 10 | 10.9 | 9.3 | 8.2 | 29% | |
| BRS | NYK | e | 511 | 33 | 32 | 33.5 | 31.1 | 27.3 | 17% | |
| BRS | QVG | e | 10,681 | 4 | 3 | 4.6 | 3.5 | 2.7 | 39% | |
| BRT | JAM | e | 20 | 15 | 12 | 17.1 | 14.2 | 12.4 | 18% | |
| BSD | ADL | e | 13,506 | 3 | 2 | 2.6 | 2.4 | 1.7 | 36% | |
| BSD | BDY | e | 1,978 | 4 | 4 | 3.4 | 3.2 | 2.9 | 27% | |
| BSD | DGL | e | 16,330 | 3 | 2 | 3.1 | 2.9 | 2.0 | 27% | |
| BSD | FLS | e | 530 | 6 | 4 | 5.2 | 4.8 | 4.3 | 25% | |
| BSD | GNK | e | 681 | 5 | 5 | 6.9 | 6.1 | 5.4 | 0% | |
| BSD | NYK | e | 343 | 24 | 22 | 24.3 | 21.9 | 20.2 | 14% | |
| BSD | SSM | e | 2 | 7 | 2 | 10.4 | 6.8 | 5.2 | 20% | |
| BSD | WDD | e | 182 | 12 | 12 | 12.2 | 11.4 | 10.3 | 14% | |
| BSR | BTA | d | 3,648 | 6 | 6 | 7.3 | 6.5 | 5.1 | 19% | |
| BSR | ISP | d | 6,280 | 5 | 4 | 4.7 | 4.4 | 3.6 | 28% | |
| BSR | JAM | d | 249 | 44 | 44 | 39.7 | 38.8 | 37.1 | 16% | |
| BSR | SVL | d | 870 | 11 | 10 | 11.9 | 11.3 | 9.1 | 18% | |
| BTA | AVL | d | 1 | 6 | 6 | 7.1 | 7.1 | 7.1 | 0% | |
| BTA | AVL | e | 1 | 6 | 6 | 7.8 | 7.8 | 7.8 | 0% | |
| BTA | BSR | d | 2,751 | 6 | 5 | 6.9 | 6.0 | 4.9 | 19% | |
| BTA | HVL | d | 235 | 18 | 18 | 18.3 | 17.4 | 15.9 | 12% | |
| BTA | JAM | d | 2,120 | 41 | 33 | 38.6 | 32.9 | 28.6 | 31% | |
| BTA | JAM | e | 1 | 37 | 37 | 35.9 | 35.9 | 35.9 | 3% | |
| BTA | LHT | e | 8 | 5 | 5 | 5.0 | 4.7 | 4.6 | 7% | |
| BTA | MPK | d | 32 | 9 | 9 | 9.1 | 8.7 | 8.3 | 7% | |
| BTA | PD | d | 95 | 24 | 22 | 25.4 | 22.0 | 20.6 | 13% | |
| BWD | CI | e | 11,669 | 4 | 4 | 4.2 | 3.8 | 2.7 | 37% | |
| BWD | DPK | e | 10,645 | 5 | 3 | 4.3 | 4.0 | 2.9 | 38% | |
| BWD | NYK | e | 206 | 57 | 56 | 58.3 | 54.7 | 50.9 | 10% | |
| BWN | FPT | d | 1 | 3 | 3 | 3.0 | 3.0 | 3.0 | 1% | |
| BWN | FPT | e | 17,005 | 3 | 2 | 2.8 | 2.6 | 2.1 | 31% | |
| BWN | JAM | e | 37 | 19 | 19 | 22.1 | 21.4 | 19.9 | 0% | |
| BWN | NYK | e | 122 | 40 | 40 | 41.4 | 40.0 | 35.0 | 12% | |
| BWN | RVC | e | 17,884 | 3 | 3 | 3.5 | 3.3 | 2.4 | 24% | |
| CAV | ERY | e | 11,275 | 2 | 2 | 1.9 | 1.7 | 1.5 | 27% | |
| CAV | JAM | e | 249 | 18 | 18 | 15.9 | 14.0 | 11.4 | 36% | |
| CAV | LYN | e | 10,757 | 3 | 2 | 2.5 | 2.3 | 1.8 | 40% | |
| CHT | LCE | e | 10,415 | 2 | 2 | 2.2 | 2.0 | 1.6 | 21% | |
| CHT | WMR | e | 10,913 | 3 | 3 | 2.5 | 2.3 | 1.7 | 42% | |
| CI | BWD | e | 10,610 | 4 | 3 | 5.0 | 4.3 | 3.3 | 24% | |
| CI | RON | e | 9,600 | 7 | 6 | 6.9 | 6.4 | 5.3 | 22% | |
| CLP | GCY | e | 11,069 | 3 | 3 | 3.2 | 3.0 | 2.3 | 23% | |
| CLP | HEM | e | 8,091 | 4 | 4 | 3.8 | 3.4 | 1.9 | 56% | |
| CPG | AVL | e | 17,748 | 2 | 2 | 2.5 | 2.4 | 1.7 | 25% | |
| CPG | LHT | d | 2 | 3 | 3 | 3.6 | 3.6 | 3.5 | 0% | |
| CPG | LHT | e | 17,124 | 3 | 3 | 3.1 | 2.9 | 2.0 | 32% | |
| CPL | HVL | d | 50 | 6 | 6 | 6.6 | 6.2 | 5.5 | 14% | |
| CPL | HVL | e | 1,946 | 6 | 6 | 5.8 | 5.3 | 4.7 | 24% | |
| CPL | MIN | d | 47 | 3 | 3 | 4.0 | 3.7 | 2.9 | 12% | |
| CPL | MIN | e | 8,758 | 3 | 2 | 3.8 | 3.3 | 2.4 | 23% | |
| CPL | NYK | e | 204 | 40 | 40 | 41.2 | 39.2 | 35.6 | 11% | |
| CPL | WBY | d | 1 | 2 | 2 | 2.9 | 2.9 | 2.9 | 0% | |
| CPL | WBY | e | 8,098 | 3 | 2 | 2.5 | 2.4 | 2.0 | 27% | |
| CSH | HUN | d | 2,476 | 7 | 6 | 6.9 | 6.7 | 5.9 | 13% | |
| CSH | HUN | e | 9,616 | 6 | 5 | 6.4 | 6.0 | 5.9 | 8% | |
| CSH | SYT | d | 1,450 | 7 | 5 | 5.8 | 5.5 | 5.1 | 24% | |
| CSH | SYT | e | 12,288 | 6 | 5 | 5.3 | 5.0 | 4.5 | 25% | |
| DGL | BSD | e | 16,050 | 3 | 2 | 2.9 | 2.7 | 2.1 | 30% | |
| DGL | LNK | e | 16,274 | 2 | 2 | 2.1 | 2.0 | 1.2 | 42% | |
| DGL | NYK | e | 240 | 27 | 27 | 27.6 | 25.9 | 21.1 | 22% | |
| DPK | BWD | e | 11,910 | 5 | 4 | 4.2 | 4.0 | 3.1 | 36% | |
| DPK | WYD | e | 10,993 | 5 | 4 | 5.3 | 4.8 | 3.8 | 24% | |
| EHN | AGT | d | 2,208 | 5 | 5 | 5.5 | 5.1 | 3.8 | 26% | |
| EHN | BHN | d | 2,153 | 9 | 7 | 9.1 | 8.4 | 7.0 | 25% | |
| EHN | MTK | d | 12 | 21 | 21 | 22.2 | 21.4 | 20.6 | 2% | |
| ENY | ATL | e | 523 | 12 | 10 | 10.2 | 9.3 | 9.0 | 25% | |
| ENY | JAM | e | 20,779 | 11 | 9 | 9.4 | 8.5 | 7.3 | 32% | |
| ENY | NAV | e | 17,936 | 5 | 4 | 4.6 | 4.4 | 3.6 | 28% | |
| ERY | CAV | e | 10,971 | 2 | 1 | 1.9 | 1.8 | 1.3 | 35% | |
| ERY | ODE | e | 11,276 | 2 | 2 | 1.9 | 1.8 | 1.4 | 32% | |
| EWN | ABT | d | 5,243 | 3 | 3 | 3.1 | 2.9 | 2.2 | 31% | |
| EWN | JAM | d | 126 | 20 | 20 | 20.0 | 18.3 | 17.3 | 14% | |
| EWN | MIN | d | 5,151 | 5 | 3 | 5.8 | 5.0 | 4.1 | 20% | |
| EWN | MIN | e | 273 | 5 | 5 | 3.8 | 3.4 | 2.3 | 53% | |
| FHL | KGN | d | 15 | 2 | 2 | 3.1 | 2.9 | 1.7 | 16% | |
| FHL | KGN | e | 14,285 | 2 | 2 | 2.8 | 2.4 | 1.7 | 17% | |
| FHL | NYK | d | 38 | 16 | 16 | 8.6 | 5.6 | 5.6 | 65% | |
| FHL | NYK | e | 9,338 | 16 | 13 | 13.6 | 12.6 | 10.3 | 34% | |
| FHL | WDD | e | 5,686 | 5 | 5 | 4.9 | 4.6 | 3.9 | 29% | |
| FLS | BDY | e | 1,670 | 3 | 3 | 3.0 | 2.6 | 2.3 | 25% | |
| FLS | BSD | e | 274 | 5 | 5 | 5.0 | 4.7 | 4.3 | 13% | |
| FLS | MHL | e | 13,655 | 2 | 2 | 2.5 | 2.1 | 1.5 | 24% | |
| FLS | NYK | e | 178 | 18 | 18 | 18.9 | 17.3 | 14.6 | 19% | |
| FLS | SSM | e | 1,873 | 1 | 1 | 2.1 | 1.5 | 1.4 | 0% | |
| FLS | WDD | e | 11,737 | 8 | 6 | 7.2 | 6.6 | 5.6 | 33% | |
| FMD | BPG | e | 10,156 | 5 | 4 | 4.9 | 4.5 | 3.6 | 29% | |
| FMD | HVL | e | 36 | 17 | 9 | 9.1 | 8.2 | 6.4 | 62% | |
| FMD | JAM | e | 272 | 30 | 30 | 30.3 | 28.3 | 24.2 | 20% | |
| FMD | PLN | e | 3,514 | 4 | 4 | 3.9 | 3.5 | 2.6 | 38% | |
| FMD | WYD | e | 7,597 | 6 | 5 | 5.8 | 5.4 | 4.4 | 24% | |
| FPK | BRS | e | 11,368 | 2 | 2 | 2.2 | 2.0 | 1.4 | 41% | |
| FPK | JAM | e | 281 | 13 | 13 | 9.7 | 9.1 | 8.6 | 34% | |
| FPK | MIN | e | 43 | 6 | 6 | 5.3 | 5.0 | 3.7 | 39% | |
| FPK | NHP | e | 785 | 3 | 2 | 2.9 | 2.7 | 1.9 | 27% | |
| FPK | QVG | e | 277 | 4 | 4 | 3.4 | 3.2 | 2.9 | 28% | |
| FPK | SMR | e | 10,554 | 3 | 2 | 3.0 | 2.8 | 2.4 | 20% | |
| FPT | BMR | d | 1 | 5 | 5 | 5.7 | 5.7 | 5.7 | 0% | |
| FPT | BMR | e | 748 | 5 | 5 | 4.3 | 4.1 | 3.2 | 36% | |
| FPT | BTA | e | 1,420 | 22 | 16 | 19.8 | 15.3 | 12.8 | 42% | |
| FPT | BWN | e | 16,775 | 3 | 2 | 2.9 | 2.7 | 1.9 | 36% | |
| FPT | JAM | d | 1 | 21 | 21 | 19.2 | 19.2 | 19.2 | 8% | |
| FPT | JAM | e | 1,794 | 21 | 20 | 19.8 | 17.6 | 15.6 | 27% | |
| FPT | LYN | e | 201 | 5 | 5 | 6.1 | 5.8 | 4.8 | 5% | |
| FPT | MQA | e | 268 | 9 | 9 | 7.4 | 6.9 | 6.4 | 28% | |
| FPT | MRK | d | 2 | 3 | 3 | 6.1 | 4.9 | 3.8 | 0% | |
| FPT | MRK | e | 16,344 | 3 | 2 | 3.2 | 3.0 | 2.2 | 27% | |
| FPT | SAB | e | 387 | 14 | 14 | 12.8 | 12.1 | 10.0 | 28% | |
| FPT | SFD | e | 541 | 8 | 7 | 6.6 | 5.9 | 5.0 | 37% | |
| FRY | IWD | e | 9,374 | 4 | 3 | 1.5 | 1.1 | 1.1 | 75% | |
| GBN | HWT | e | 10,571 | 3 | 2 | 2.8 | 2.6 | 2.0 | 25% | |
| GBN | JAM | e | 262 | 16 | 16 | 17.9 | 16.7 | 15.1 | 6% | |
| GBN | ROS | e | 276 | 7 | 7 | 7.8 | 7.0 | 6.3 | 10% | |
| GBN | VSM | e | 10,390 | 4 | 3 | 4.1 | 3.6 | 2.9 | 26% | |
| GCV | GST | d | 5,512 | 2 | 2 | 2.4 | 2.0 | 1.5 | 27% | |
| GCV | LVL | d | 5,039 | 5 | 4 | 3.4 | 3.3 | 2.3 | 49% | |
| GCY | CLP | e | 9,974 | 3 | 3 | 3.2 | 3.0 | 2.3 | 26% | |
| GCY | HEM | e | 152 | 6 | 6 | 6.1 | 5.8 | 4.6 | 23% | |
| GCY | NBD | e | 11,201 | 2 | 2 | 2.6 | 2.4 | 1.8 | 14% | |
| GHD | GVL | d | 5,450 | 3 | 3 | 3.0 | 2.8 | 2.2 | 29% | |
| GHD | SCF | d | 5,178 | 3 | 3 | 3.2 | 3.0 | 2.2 | 31% | |
| GNK | BSD | e | 567 | 7 | 6 | 6.0 | 5.4 | 3.8 | 46% | |
| GNK | FLS | e | 273 | 10 | 10 | 10.3 | 9.1 | 8.0 | 20% | |
| GNK | LNK | e | 15,561 | 2 | 2 | 2.9 | 2.5 | 1.7 | 24% | |
| GNK | MHT | e | 15,183 | 3 | 2 | 3.3 | 2.3 | 2.3 | 23% | |
| GNK | NYK | e | 780 | 24 | 24 | 24.4 | 22.7 | 18.6 | 23% | |
| GNK | SSM | e | 45 | 10 | 10 | 10.4 | 10.0 | 8.4 | 16% | |
| GNK | WDD | e | 709 | 15 | 13 | 15.3 | 14.5 | 13.3 | 9% | |
| GPT | SHD | d | 1,053 | 10 | 10 | 9.4 | 8.3 | 6.7 | 33% | |
| GRV | ISP | d | 6,136 | 4 | 4 | 3.9 | 3.7 | 2.9 | 30% | |
| GRV | ODL | d | 6,205 | 4 | 4 | 4.3 | 4.0 | 3.1 | 22% | |
| GST | GCV | d | 5,250 | 3 | 3 | 2.8 | 2.6 | 1.6 | 45% | |
| GST | SCF | d | 5,567 | 2 | 2 | 2.3 | 2.2 | 1.5 | 28% | |
| GVL | GHD | d | 5,193 | 3 | 3 | 3.0 | 2.8 | 2.2 | 29% | |
| GVL | RSN | d | 5,542 | 4 | 3 | 4.7 | 4.5 | 3.6 | 13% | |
| GWN | HUN | d | 5,438 | 6 | 5 | 5.2 | 4.8 | 3.6 | 39% | |
| GWN | JAM | d | 503 | 41 | 38 | 41.7 | 39.0 | 37.0 | 9% | |
| GWN | MIN | d | 250 | 27 | 27 | 29.8 | 28.6 | 27.1 | 0% | |
| GWN | NPT | d | 5,810 | 5 | 4 | 4.4 | 4.2 | 3.3 | 35% | |
| HBY | SHN | d | 2,478 | 10 | 10 | 11.6 | 11.3 | 8.1 | 19% | |
| HBY | WHN | d | 2,023 | 11 | 7 | 11.3 | 10.4 | 9.2 | 14% | |
| HEM | CLP | e | 9,826 | 3 | 2 | 1.8 | 1.2 | 1.2 | 62% | |
| HGN | LVW | e | 4,434 | 2 | 2 | 2.1 | 2.0 | 1.3 | 39% | |
| HGN | WHD | e | 4,402 | 5 | 4 | 3.2 | 3.0 | 1.8 | 63% | |
| HOL | JAM | e | 10,956 | 9 | 5 | 6.5 | 5.7 | 4.2 | 55% | |
| HOL | QVG | e | 9,995 | 3 | 2 | 3.2 | 2.9 | 2.4 | 16% | |
| HPA | JAM | d | 2,482 | 19 | 18 | 17.6 | 15.9 | 13.2 | 32% | |
| HPA | JAM | e | 393 | 19 | 18 | 18.2 | 16.8 | 13.4 | 29% | |
| HPA | LIC | d | 214 | 8 | 7 | 7.3 | 6.3 | 3.5 | 57% | |
| HUN | CSH | d | 1,461 | 6 | 5 | 5.3 | 4.4 | 4.4 | 21% | |
| HUN | CSH | e | 12,149 | 5 | 5 | 4.6 | 4.1 | 4.1 | 18% | |
| HUN | GWN | d | 5,772 | 4 | 3 | 3.8 | 2.9 | 2.9 | 33% | |
| HUN | HVL | d | 508 | 15 | 15 | 16.2 | 15.0 | 13.5 | 12% | |
| HUN | JAM | d | 196 | 39 | 38 | 36.2 | 33.2 | 30.3 | 22% | |
| HUN | MIN | d | 235 | 21 | 21 | 22.9 | 21.6 | 19.4 | 8% | |
| HVL | BPG | d | 2 | 6 | 6 | 20.5 | 18.6 | 16.7 | 0% | |
| HVL | BPG | e | 10,545 | 6 | 4 | 5.2 | 4.8 | 3.8 | 32% | |
| HVL | BTA | d | 510 | 16 | 15 | 17.8 | 16.7 | 15.3 | 4% | |
| HVL | BWD | e | 263 | 15 | 15 | 17.9 | 16.4 | 15.1 | 0% | |
| HVL | CPL | d | 48 | 7 | 7 | 7.2 | 6.3 | 5.5 | 22% | |
| HVL | CPL | e | 1,682 | 7 | 7 | 6.4 | 5.8 | 4.7 | 33% | |
| HVL | FMD | e | 53 | 13 | 10 | 11.9 | 7.1 | 5.8 | 55% | |
| HVL | HUN | d | 603 | 18 | 18 | 18.5 | 17.8 | 13.5 | 25% | |
| HVL | JAM | d | 2 | 28 | 28 | 30.1 | 29.6 | 29.0 | 0% | |
| HVL | JAM | e | 3,137 | 23 | 20 | 20.2 | 18.5 | 16.1 | 31% | |
| HVL | MIN | d | 1,125 | 8 | 7 | 8.8 | 7.8 | 7.0 | 7% | |
| HVL | MIN | e | 6,606 | 8 | 0 | 8.7 | 7.4 | 6.1 | 26% | |
| HVL | NYK | e | 615 | 42 | 40 | 41.5 | 39.8 | 35.6 | 15% | |
| HVL | SYT | d | 1,034 | 8 | 6 | 8.5 | 7.8 | 6.4 | 23% | |
| HVL | SYT | e | 12,464 | 7 | 6 | 7.5 | 7.1 | 5.9 | 18% | |
| HVL | WBY | d | 144 | 5 | 4 | 5.5 | 4.7 | 3.8 | 19% | |
| HVL | WBY | e | 11,051 | 5 | 4 | 5.2 | 4.6 | 3.5 | 28% | |
| HVL | WYD | e | 533 | 13 | 13 | 12.2 | 11.3 | 10.4 | 23% | |
| HWT | GBN | e | 10,979 | 3 | 2 | 2.6 | 2.4 | 1.7 | 37% | |
| HWT | WMR | e | 10,552 | 2 | 2 | 2.0 | 1.9 | 1.3 | 35% | |
| IPK | LBH | e | 8,717 | 7 | 6 | 5.7 | 5.3 | 4.1 | 44% | |
| IPK | ODE | e | 10,878 | 4 | 4 | 4.6 | 4.4 | 3.7 | 8% | |
| ISP | BSR | d | 6,319 | 5 | 4 | 4.4 | 4.2 | 3.2 | 37% | |
| ISP | GRV | d | 6,252 | 3 | 3 | 4.1 | 3.9 | 2.6 | 16% | |
| IWD | FRY | e | 8,477 | 5 | 4 | 2.6 | 2.2 | 1.3 | 73% | |
| IWD | LCE | e | 10,731 | 2 | 2 | 1.7 | 1.4 | 1.0 | 51% | |
| JAM | ATL | e | 2,059 | 17 | 16 | 19.7 | 18.0 | 15.5 | 11% | |
| JAM | AVL | e | 270 | 26 | 26 | 26.1 | 25.1 | 23.4 | 10% | |
| JAM | BPG | e | 274 | 28 | 28 | 27.8 | 26.2 | 21.8 | 22% | |
| JAM | BRT | e | 29 | 14 | 13 | 16.1 | 13.8 | 12.8 | 9% | |
| JAM | BSR | d | 237 | 48 | 44 | 49.6 | 47.6 | 44.4 | 7% | |
| JAM | BTA | d | 405 | 41 | 33 | 39.7 | 35.0 | 29.5 | 28% | |
| JAM | BTA | e | 83 | 37 | 36 | 35.8 | 33.9 | 30.0 | 18% | |
| JAM | ENY | e | 18,512 | 8 | 7 | 10.5 | 9.0 | 7.1 | 16% | |
| JAM | EWN | d | 259 | 18 | 18 | 21.8 | 20.0 | 17.5 | 3% | |
| JAM | FHL | e | 947 | 6 | 4 | 8.1 | 6.9 | 5.5 | 1% | |
| JAM | FPK | e | 545 | 9 | 8 | 11.7 | 10.4 | 8.7 | 8% | |
| JAM | FPT | d | 2 | 22 | 21 | 44.9 | 33.5 | 22.5 | 0% | |
| JAM | FPT | e | 1,954 | 18 | 17 | 19.6 | 18.0 | 15.9 | 11% | |
| JAM | GWN | d | 20 | 41 | 41 | 41.4 | 39.5 | 38.7 | 6% | |
| JAM | HOL | e | 9,497 | 6 | 5 | 8.9 | 7.8 | 6.2 | 0% | |
| JAM | HPA | d | 1,439 | 17 | 16 | 17.5 | 15.9 | 9.8 | 44% | |
| JAM | HPA | e | 138 | 18 | 18 | 16.7 | 15.4 | 13.3 | 26% | |
| JAM | HUN | d | 907 | 38 | 38 | 40.8 | 38.7 | 35.1 | 9% | |
| JAM | HVL | d | 237 | 21 | 21 | 23.6 | 21.4 | 19.5 | 7% | |
| JAM | HVL | e | 4,475 | 22 | 19 | 22.5 | 20.8 | 17.8 | 19% | |
| JAM | KGN | d | 290 | 4 | 4 | 7.4 | 6.3 | 5.2 | 0% | |
| JAM | KGN | e | 13,822 | 4 | 4 | 5.7 | 4.7 | 3.7 | 11% | |
| JAM | LMR | e | 10,463 | 5 | 4 | 7.5 | 6.5 | 5.0 | 0% | |
| JAM | LYN | e | 6,153 | 14 | 13 | 14.5 | 13.2 | 11.6 | 14% | |
| JAM | MAV | d | 52 | 14 | 14 | 13.9 | 12.2 | 10.5 | 25% | |
| JAM | MAV | e | 1,905 | 14 | 12 | 13.3 | 12.3 | 10.2 | 25% | |
| JAM | MIN | d | 1,700 | 14 | 12 | 17.0 | 15.3 | 12.9 | 9% | |
| JAM | MIN | e | 7,062 | 14 | 12 | 15.7 | 13.9 | 12.0 | 16% | |
| JAM | MQA | e | 128 | 23 | 23 | 26.2 | 24.0 | 17.9 | 22% | |
| JAM | NAV | e | 484 | 12 | 12 | 14.6 | 13.2 | 11.1 | 11% | |
| JAM | NHP | d | 53 | 11 | 10 | 12.5 | 11.4 | 10.0 | 6% | |
| JAM | NHP | e | 9,636 | 11 | 9 | 12.3 | 10.8 | 9.2 | 16% | |
| JAM | NYK | d | 786 | 19 | 18 | 17.3 | 16.5 | 13.1 | 32% | |
| JAM | NYK | e | 15,729 | 19 | 17 | 19.2 | 17.7 | 13.1 | 31% | |
| JAM | QVG | e | 554 | 8 | 8 | 10.8 | 8.7 | 7.6 | 4% | |
| JAM | ROS | e | 557 | 8 | 8 | 8.6 | 8.1 | 7.0 | 12% | |
| JAM | RVC | d | 1 | 15 | 15 | 21.9 | 21.9 | 21.9 | 0% | |
| JAM | RVC | e | 4,744 | 15 | 13 | 16.4 | 15.1 | 13.4 | 13% | |
| JAM | SAB | e | 6,326 | 6 | 5 | 8.2 | 7.3 | 5.9 | 1% | |
| JAM | SFD | e | 509 | 24 | 23 | 24.1 | 22.6 | 21.0 | 13% | |
| JAM | VSM | e | 10,697 | 10 | 10 | 11.6 | 10.3 | 8.8 | 14% | |
| JAM | WDD | d | 47 | 10 | 10 | 10.6 | 10.2 | 9.6 | 4% | |
| JAM | WDD | e | 24,586 | 9 | 7 | 10.0 | 8.8 | 7.5 | 19% | |
| JAM | WWD | e | 1,100 | 15 | 15 | 17.0 | 15.5 | 12.7 | 17% | |
| KGN | FHL | d | 45 | 2 | 2 | 3.2 | 2.9 | 1.6 | 22% | |
| KGN | FHL | e | 13,129 | 2 | 2 | 2.6 | 2.4 | 1.7 | 19% | |
| KGN | JAM | d | 15 | 7 | 7 | 4.5 | 4.2 | 3.5 | 50% | |
| KGN | JAM | e | 14,352 | 7 | 5 | 5.2 | 4.6 | 3.9 | 43% | |
| KGN | NYK | d | 183 | 18 | 18 | 12.3 | 11.6 | 11.0 | 39% | |
| KGN | NYK | e | 372 | 18 | 16 | 16.0 | 14.5 | 11.0 | 40% | |
| KGN | WDD | e | 304 | 6 | 5 | 6.0 | 5.6 | 5.1 | 11% | |
| KPK | NPT | d | 5,971 | 7 | 5 | 8.0 | 5.9 | 4.7 | 33% | |
| KPK | STN | d | 5,894 | 8 | 6 | 8.5 | 7.9 | 5.9 | 29% | |
| LBH | IPK | e | 10,961 | 6 | 6 | 4.9 | 4.3 | 2.6 | 56% | |
| LBH | JAM | e | 46 | 27 | 27 | 24.1 | 22.4 | 20.8 | 24% | |
| LCE | CHT | e | 10,867 | 2 | 2 | 2.4 | 2.1 | 1.6 | 35% | |
| LCE | IWD | e | 10,128 | 3 | 2 | 2.1 | 1.9 | 1.2 | 55% | |
| LHT | BTA | d | 2 | 5 | 5 | 5.0 | 4.9 | 4.8 | 5% | |
| LHT | BTA | e | 14,726 | 5 | 5 | 4.9 | 4.4 | 3.4 | 36% | |
| LHT | CPG | e | 17,368 | 3 | 2 | 3.0 | 2.8 | 2.1 | 30% | |
| LMR | JAM | e | 10,854 | 8 | 6 | 6.3 | 5.8 | 4.9 | 42% | |
| LMR | LTN | e | 11,162 | 2 | 2 | 2.5 | 2.2 | 1.9 | 4% | |
| LNK | BSD | e | 267 | 5 | 5 | 3.9 | 3.6 | 3.2 | 35% | |
| LNK | DGL | e | 15,835 | 2 | 2 | 2.1 | 1.9 | 1.4 | 32% | |
| LNK | GNK | e | 20,201 | 3 | 2 | 2.8 | 2.6 | 1.7 | 45% | |
| LTN | LMR | e | 10,491 | 2 | 2 | 2.2 | 2.0 | 1.6 | 21% | |
| LTN | NYK | e | 297 | 31 | 31 | 30.3 | 28.7 | 25.2 | 19% | |
| LTN | ROS | e | 11,179 | 3 | 2 | 2.4 | 2.2 | 1.9 | 36% | |
| LVL | GCV | d | 5,438 | 4 | 3 | 3.4 | 3.2 | 2.5 | 40% | |
| LVL | OBY | d | 3,539 | 11 | 10 | 9.6 | 8.9 | 7.7 | 30% | |
| LVW | HGN | e | 5,412 | 2 | 2 | 2.4 | 2.2 | 1.9 | 4% | |
| LVW | MVN | e | 4,591 | 2 | 2 | 2.9 | 2.7 | 2.1 | 9% | |
| LYN | CAV | e | 11,308 | 2 | 1 | 2.6 | 2.4 | 1.8 | 12% | |
| LYN | FPT | e | 985 | 6 | 5 | 6.0 | 5.5 | 4.5 | 19% | |
| LYN | JAM | e | 8,395 | 16 | 14 | 13.2 | 12.3 | 11.1 | 30% | |
| LYN | NYK | e | 136 | 34 | 34 | 34.4 | 32.9 | 29.2 | 14% | |
| LYN | RVC | e | 7,167 | 3 | 2 | 3.1 | 2.9 | 2.0 | 27% | |
| LYN | SAB | e | 795 | 8 | 8 | 7.5 | 7.1 | 6.5 | 22% | |
| LYN | VSM | e | 10,328 | 3 | 3 | 3.8 | 3.3 | 2.4 | 22% | |
| MAK | RHD | d | 1,230 | 16 | 15 | 16.5 | 15.9 | 15.4 | 5% | |
| MAK | SHD | d | 892 | 14 | 14 | 14.0 | 13.5 | 12.8 | 9% | |
| MAV | JAM | d | 50 | 13 | 13 | 12.7 | 12.1 | 11.4 | 13% | |
| MAV | JAM | e | 1,785 | 13 | 13 | 11.6 | 11.0 | 9.2 | 30% | |
| MAV | MIN | d | 51 | 2 | 2 | 2.9 | 2.2 | 1.7 | 15% | |
| MAV | MIN | e | 9,788 | 3 | 1 | 2.7 | 2.4 | 1.7 | 38% | |
| MAV | NHP | e | 8,287 | 2 | 1 | 2.6 | 2.3 | 1.6 | 33% | |
| MFD | RON | d | 1,043 | 11 | 11 | 12.0 | 11.3 | 9.9 | 13% | |
| MFD | YPK | d | 1,003 | 8 | 8 | 7.6 | 7.3 | 6.8 | 15% | |
| MHL | ADL | e | 1,695 | 3 | 3 | 3.0 | 2.8 | 2.2 | 26% | |
| MHL | BDY | e | 11,998 | 2 | 2 | 2.2 | 2.0 | 1.4 | 31% | |
| MHL | FLS | e | 13,324 | 2 | 2 | 2.2 | 2.1 | 1.5 | 26% | |
| MHT | ADL | e | 262 | 11 | 11 | 12.1 | 11.3 | 9.7 | 12% | |
| MHT | GNK | e | 19,760 | 3 | 2 | 3.2 | 3.0 | 2.4 | 19% | |
| MHT | PDM | e | 13,062 | 2 | 2 | 2.7 | 2.5 | 1.9 | 7% | |
| MHT | PWS | e | 1,107 | 8 | 8 | 6.8 | 6.3 | 5.6 | 32% | |
| MIN | BTA | d | 256 | 25 | 25 | 24.6 | 23.0 | 21.2 | 15% | |
| MIN | CPL | d | 50 | 3 | 2 | 4.2 | 4.0 | 3.6 | 0% | |
| MIN | CPL | e | 10,037 | 3 | 2 | 3.8 | 3.5 | 2.6 | 14% | |
| MIN | EWN | d | 4,715 | 4 | 4 | 4.9 | 4.4 | 3.2 | 25% | |
| MIN | HVL | d | 1,400 | 10 | 8 | 8.9 | 7.9 | 6.7 | 31% | |
| MIN | HVL | e | 5,954 | 9 | 7 | 8.2 | 7.3 | 6.3 | 28% | |
| MIN | JAM | d | 5,660 | 16 | 12 | 14.5 | 13.0 | 11.3 | 30% | |
| MIN | JAM | e | 8,806 | 16 | 13 | 13.8 | 12.6 | 10.1 | 36% | |
| MIN | MAV | d | 48 | 3 | 2 | 4.1 | 3.4 | 3.0 | 0% | |
| MIN | MAV | e | 10,054 | 2 | 2 | 3.0 | 2.7 | 1.9 | 25% | |
| MIN | NHP | d | 47 | 4 | 4 | 4.5 | 4.3 | 3.4 | 16% | |
| MIN | NHP | e | 1,746 | 4 | 3 | 3.9 | 3.6 | 2.7 | 30% | |
| MIN | SYT | d | 240 | 17 | 17 | 15.3 | 14.5 | 13.8 | 19% | |
| MIN | WBY | d | 52 | 5 | 5 | 6.2 | 5.0 | 4.3 | 15% | |
| MIN | WBY | e | 3,435 | 5 | 4 | 4.8 | 4.3 | 3.6 | 28% | |
| MPK | AVL | d | 2 | 4 | 3 | 4.0 | 4.0 | 4.0 | 0% | |
| MPK | AVL | e | 17,255 | 3 | 2 | 3.3 | 3.1 | 2.3 | 23% | |
| MPK | BTA | e | 157 | 10 | 10 | 9.5 | 8.7 | 8.2 | 18% | |
| MPK | MQA | d | 32 | 3 | 3 | 2.6 | 2.4 | 2.2 | 28% | |
| MPK | MQA | e | 16,328 | 2 | 2 | 2.2 | 2.0 | 1.5 | 29% | |
| MQA | AVL | d | 1 | 6 | 6 | 6.6 | 6.6 | 6.6 | 0% | |
| MQA | AVL | e | 740 | 4 | 4 | 3.9 | 3.6 | 2.9 | 31% | |
| MQA | BMR | d | 1 | 6 | 6 | 4.8 | 4.8 | 4.8 | 19% | |
| MQA | BMR | e | 847 | 6 | 5 | 4.6 | 4.3 | 3.9 | 34% | |
| MQA | MPK | d | 2 | 2 | 2 | 2.5 | 2.5 | 2.5 | 0% | |
| MQA | MPK | e | 17,769 | 2 | 2 | 2.1 | 1.9 | 1.4 | 32% | |
| MQA | SFD | d | 32 | 3 | 3 | 3.1 | 3.0 | 2.6 | 14% | |
| MQA | SFD | e | 17,845 | 2 | 2 | 2.4 | 2.2 | 1.8 | 26% | |
| MRK | BMR | d | 2 | 3 | 3 | 3.4 | 3.3 | 3.3 | 0% | |
| MRK | BMR | e | 17,311 | 3 | 2 | 2.6 | 2.5 | 1.9 | 36% | |
| MRK | FPT | e | 15,325 | 3 | 3 | 3.2 | 2.9 | 2.0 | 34% | |
| MRK | JAM | e | 1,244 | 23 | 21 | 21.1 | 19.8 | 18.0 | 21% | |
| MRK | NYK | e | 882 | 42 | 40 | 42.9 | 41.0 | 37.2 | 11% | |
| MRK | RVC | e | 268 | 7 | 7 | 7.1 | 6.2 | 5.6 | 20% | |
| MSY | BPT | d | 3,120 | 7 | 5 | 6.9 | 6.4 | 5.0 | 24% | |
| MSY | PD | d | 1,100 | 14 | 10 | 12.2 | 10.9 | 9.8 | 28% | |
| MSY | SPK | d | 3,917 | 17 | 15 | 13.4 | 12.1 | 10.8 | 37% | |
| MTK | AGT | d | 2,310 | 19 | 18 | 15.6 | 14.1 | 12.5 | 34% | |
| MTK | EHN | d | 4 | 25 | 24 | 21.8 | 19.9 | 17.8 | 29% | |
| MVN | LVW | e | 5,449 | 2 | 2 | 3.0 | 2.8 | 2.3 | 0% | |
| MVN | WWD | e | 4,605 | 3 | 2 | 2.5 | 2.2 | 1.8 | 38% | |
| NAV | ATL | e | 15,804 | 6 | 3 | 6.4 | 5.7 | 5.7 | 1% | |
| NAV | ENY | e | 19,822 | 5 | 4 | 5.0 | 4.6 | 3.9 | 21% | |
| NAV | JAM | e | 835 | 14 | 14 | 12.4 | 11.8 | 11.1 | 23% | |
| NBD | GCY | e | 10,482 | 3 | 2 | 2.9 | 2.8 | 1.9 | 34% | |
| NBD | SMR | e | 11,367 | 3 | 2 | 2.4 | 2.3 | 1.8 | 40% | |
| NHP | FPK | e | 562 | 2 | 1 | 3.1 | 2.8 | 2.5 | 0% | |
| NHP | JAM | d | 49 | 13 | 12 | 11.7 | 11.2 | 10.3 | 18% | |
| NHP | JAM | e | 9,528 | 13 | 11 | 11.0 | 10.1 | 8.7 | 34% | |
| NHP | MAV | d | 1 | 2 | 2 | 3.1 | 3.1 | 3.1 | 0% | |
| NHP | MAV | e | 7,891 | 2 | 2 | 2.9 | 2.6 | 1.6 | 20% | |
| NHP | MIN | d | 306 | 5 | 4 | 5.6 | 5.0 | 3.6 | 25% | |
| NHP | MIN | e | 2,554 | 4 | 4 | 4.0 | 3.4 | 2.6 | 36% | |
| NPT | GWN | d | 5,915 | 5 | 5 | 4.4 | 4.2 | 3.3 | 35% | |
| NPT | KPK | d | 5,951 | 6 | 5 | 6.3 | 5.6 | 4.6 | 27% | |
| NYK | WDD | e | 1 | 11 | 11 | 9.7 | 9.7 | 9.7 | 12% | |
| OBY | LVL | d | 5,469 | 10 | 10 | 9.7 | 9.1 | 7.7 | 24% | |
| ODE | ERY | e | 10,924 | 2 | 2 | 2.0 | 1.8 | 1.5 | 26% | |
| ODE | IPK | e | 11,160 | 4 | 4 | 4.5 | 4.3 | 3.7 | 13% | |
| ODL | GRV | d | 6,166 | 4 | 3 | 4.4 | 4.0 | 3.2 | 22% | |
| ODL | ISP | d | 237 | 7 | 7 | 6.2 | 5.8 | 5.3 | 25% | |
| ODL | SVL | d | 6,088 | 5 | 4 | 4.5 | 4.3 | 3.7 | 24% | |
| PD | BPT | d | 2,497 | 6 | 5 | 6.9 | 6.5 | 5.5 | 6% | |
| PD | BTA | d | 171 | 23 | 21 | 21.4 | 20.0 | 18.3 | 21% | |
| PD | JAM | d | 77 | 65 | 57 | 64.6 | 62.2 | 54.1 | 17% | |
| PD | MSY | d | 875 | 12 | 10 | 11.9 | 11.3 | 10.5 | 10% | |
| PD | SPK | d | 231 | 25 | 25 | 24.9 | 21.5 | 19.9 | 22% | |
| PD | SVL | d | 3,587 | 7 | 7 | 6.8 | 6.3 | 5.4 | 25% | |
| PDM | MHT | e | 13,364 | 2 | 2 | 2.6 | 2.4 | 1.8 | 14% | |
| PDM | PWS | e | 8,331 | 6 | 5 | 5.4 | 5.0 | 2.8 | 51% | |
| PJN | BK | d | 31 | 10 | 9 | 20.8 | 16.4 | 9.9 | 4% | |
| PLN | FMD | e | 3,042 | 4 | 3 | 3.5 | 3.2 | 2.5 | 30% | |
| PLN | WYD | e | 3,555 | 2 | 2 | 3.4 | 3.1 | 2.5 | 0% | |
| PWS | MHT | e | 2,745 | 7 | 6 | 5.8 | 5.3 | 4.2 | 39% | |
| PWS | PDM | e | 13,160 | 5 | 5 | 4.0 | 3.5 | 2.8 | 44% | |
| QVG | BRS | e | 10,484 | 3 | 2 | 2.6 | 2.4 | 1.8 | 26% | |
| QVG | HOL | e | 10,917 | 3 | 2 | 3.3 | 3.0 | 2.1 | 20% | |
| RHD | MAK | d | 909 | 16 | 16 | 16.7 | 16.3 | 15.4 | 4% | |
| RHD | YPK | d | 1,267 | 26 | 25 | 25.2 | 24.4 | 23.2 | 10% | |
| RON | CI | e | 152 | 7 | 6 | 14.7 | 5.7 | 4.5 | 35% | |
| RON | DPK | e | 5 | 14 | 12 | 24.6 | 22.2 | 13.2 | 4% | |
| RON | HVL | e | 2 | 26 | 26 | 27.9 | 26.2 | 24.5 | 6% | |
| RON | MFD | d | 1,073 | 11 | 11 | 10.0 | 8.9 | 8.9 | 20% | |
| ROS | JAM | e | 268 | 11 | 11 | 8.3 | 8.0 | 7.0 | 36% | |
| ROS | LTN | e | 10,719 | 3 | 2 | 2.5 | 2.3 | 1.6 | 46% | |
| ROS | VSM | e | 11,699 | 4 | 3 | 3.8 | 3.4 | 2.9 | 30% | |
| RSN | ABT | d | 5,469 | 3 | 3 | 3.1 | 2.9 | 2.3 | 25% | |
| RSN | GVL | d | 5,340 | 4 | 4 | 4.7 | 4.5 | 3.5 | 13% | |
| RVC | BWN | d | 1 | 3 | 3 | 4.5 | 4.5 | 4.5 | 0% | |
| RVC | BWN | e | 17,311 | 3 | 3 | 3.6 | 3.3 | 2.4 | 21% | |
| RVC | JAM | e | 4,390 | 18 | 16 | 15.3 | 14.3 | 12.9 | 29% | |
| RVC | LYN | e | 8,676 | 3 | 2 | 3.2 | 3.0 | 2.3 | 26% | |
| RVC | NYK | e | 1,046 | 37 | 34 | 36.9 | 34.9 | 30.2 | 19% | |
| RVC | SAB | e | 3,572 | 10 | 10 | 9.6 | 9.0 | 8.2 | 21% | |
| RVC | VSM | e | 120 | 8 | 8 | 7.8 | 6.6 | 5.3 | 34% | |
| SAB | FPT | e | 280 | 11 | 11 | 12.6 | 11.8 | 10.9 | 1% | |
| SAB | JAM | e | 5,945 | 8 | 6 | 7.1 | 6.3 | 5.3 | 34% | |
| SAB | LYN | e | 1,365 | 9 | 8 | 7.3 | 6.9 | 6.4 | 27% | |
| SAB | MPK | e | 280 | 20 | 20 | 18.8 | 17.6 | 16.3 | 19% | |
| SAB | RVC | e | 4,095 | 10 | 9 | 9.5 | 8.8 | 7.7 | 25% | |
| SAB | WGH | e | 273 | 16 | 16 | 15.6 | 14.9 | 14.2 | 11% | |
| SCF | GHD | d | 5,458 | 4 | 3 | 3.6 | 3.4 | 2.6 | 35% | |
| SCF | GST | d | 5,265 | 2 | 2 | 2.3 | 2.0 | 1.5 | 28% | |
| SFD | AVL | e | 530 | 5 | 5 | 4.5 | 4.1 | 3.6 | 27% | |
| SFD | FPT | e | 1,088 | 7 | 6 | 7.3 | 6.3 | 5.5 | 18% | |
| SFD | JAM | d | 32 | 28 | 28 | 27.2 | 25.6 | 23.8 | 15% | |
| SFD | JAM | e | 761 | 29 | 26 | 28.4 | 23.4 | 20.6 | 28% | |
| SFD | MQA | d | 2 | 2 | 2 | 3.0 | 3.0 | 2.9 | 0% | |
| SFD | MQA | e | 16,957 | 2 | 2 | 2.2 | 2.1 | 1.5 | 23% | |
| SFD | NYK | e | 390 | 49 | 48 | 50.3 | 48.0 | 44.9 | 9% | |
| SFD | WGH | e | 15,280 | 3 | 2 | 2.7 | 2.5 | 1.9 | 31% | |
| SHD | GPT | d | 664 | 10 | 10 | 9.3 | 8.8 | 7.9 | 21% | |
| SHD | MAK | d | 1,051 | 12 | 12 | 13.5 | 13.1 | 12.4 | 0% | |
| SHN | BHN | d | 2,384 | 10 | 8 | 10.8 | 10.0 | 6.9 | 28% | |
| SHN | HBY | d | 2,158 | 10 | 10 | 11.6 | 11.0 | 9.2 | 9% | |
| SJM | BK | d | 5,640 | 6 | 4 | 5.9 | 5.6 | 4.8 | 19% | |
| SJM | STN | d | 5,844 | 6 | 5 | 4.7 | 4.4 | 3.5 | 38% | |
| SMR | FPK | e | 11,250 | 3 | 3 | 3.6 | 3.3 | 2.4 | 20% | |
| SMR | NBD | e | 10,535 | 3 | 3 | 2.3 | 2.2 | 1.8 | 42% | |
| SPK | JAM | d | 36 | 82 | 80 | 76.0 | 71.6 | 67.7 | 17% | |
| SPK | MSY | d | 4,307 | 17 | 15 | 14.7 | 12.1 | 9.0 | 47% | |
| SPK | WHN | d | 2,246 | 6 | 6 | 5.5 | 4.7 | 3.7 | 40% | |
| SSM | BSD | e | 12 | 6 | 6 | 6.8 | 6.4 | 5.9 | 1% | |
| SSM | FLS | e | 440 | 3 | 2 | 3.9 | 3.4 | 1.8 | 46% | |
| SSM | GNK | e | 13 | 12 | 12 | 14.0 | 12.9 | 10.4 | 13% | |
| SSM | WDD | e | 440 | 7 | 5 | 6.7 | 6.0 | 4.6 | 34% | |
| STN | KPK | d | 5,879 | 9 | 6 | 9.0 | 7.8 | 6.7 | 26% | |
| STN | SJM | d | 5,809 | 6 | 5 | 5.5 | 5.0 | 4.0 | 34% | |
| SVL | BSR | d | 140 | 13 | 10 | 12.5 | 11.4 | 9.1 | 31% | |
| SVL | BTA | d | 233 | 15 | 15 | 16.9 | 15.9 | 15.1 | 0% | |
| SVL | ODL | d | 6,413 | 4 | 4 | 4.5 | 4.1 | 3.3 | 23% | |
| SVL | PD | d | 5,218 | 7 | 6 | 7.5 | 7.0 | 5.9 | 19% | |
| SYT | CSH | d | 1,854 | 6 | 5 | 5.9 | 5.7 | 4.8 | 19% | |
| SYT | CSH | e | 12,372 | 5 | 4 | 5.3 | 5.1 | 4.0 | 20% | |
| SYT | HPA | d | 104 | 45 | 45 | 45.5 | 42.8 | 39.0 | 13% | |
| SYT | HVL | d | 951 | 7 | 7 | 7.6 | 7.3 | 6.2 | 16% | |
| SYT | HVL | e | 11,902 | 7 | 5 | 7.2 | 6.7 | 5.6 | 23% | |
| SYT | JAM | e | 267 | 26 | 26 | 26.8 | 25.4 | 23.5 | 10% | |
| SYT | NYK | e | 411 | 47 | 47 | 47.3 | 45.5 | 41.3 | 13% | |
| VSM | FPT | e | 109 | 7 | 7 | 9.4 | 8.9 | 8.3 | 0% | |
| VSM | GBN | e | 10,292 | 4 | 3 | 4.0 | 3.8 | 2.9 | 22% | |
| VSM | JAM | e | 9,670 | 12 | 10 | 10.4 | 9.5 | 8.3 | 32% | |
| VSM | LMR | e | 274 | 7 | 7 | 6.3 | 6.1 | 4.6 | 34% | |
| VSM | LYN | e | 11,384 | 3 | 2 | 3.7 | 3.3 | 2.4 | 20% | |
| VSM | NYK | e | 272 | 32 | 32 | 30.3 | 28.6 | 25.9 | 19% | |
| VSM | ROS | e | 10,418 | 3 | 2 | 3.4 | 3.1 | 2.3 | 30% | |
| VSM | WWD | e | 862 | 4 | 4 | 5.8 | 4.8 | 4.0 | 1% | |
| WBY | CPL | e | 6,739 | 2 | 2 | 2.6 | 2.3 | 1.5 | 35% | |
| WBY | HVL | d | 53 | 5 | 5 | 5.8 | 5.4 | 5.0 | 0% | |
| WBY | HVL | e | 11,678 | 5 | 4 | 4.9 | 4.5 | 3.7 | 29% | |
| WBY | MIN | d | 142 | 4 | 4 | 4.9 | 4.6 | 3.6 | 10% | |
| WBY | MIN | e | 4,676 | 5 | 3 | 5.0 | 4.2 | 3.2 | 30% | |
| WDD | FHL | e | 4,534 | 5 | 4 | 5.4 | 4.8 | 4.0 | 19% | |
| WDD | FLS | e | 11,279 | 9 | 7 | 7.9 | 7.0 | 5.6 | 34% | |
| WDD | JAM | d | 199 | 11 | 11 | 10.7 | 10.0 | 7.8 | 29% | |
| WDD | JAM | e | 23,692 | 11 | 9 | 10.5 | 9.3 | 7.6 | 33% | |
| WDD | NYK | d | 33 | 11 | 11 | 5.2 | 3.6 | 3.6 | 67% | |
| WDD | NYK | e | 48,792 | 11 | 9 | 10.3 | 9.3 | 7.0 | 36% | |
| WDD | SSM | e | 2,055 | 5 | 5 | 4.5 | 3.9 | 3.9 | 21% | |
| WGH | BMR | e | 16,876 | 3 | 2 | 2.6 | 2.4 | 1.8 | 38% | |
| WGH | FPT | e | 534 | 6 | 6 | 5.3 | 4.9 | 4.4 | 27% | |
| WGH | SFD | d | 2 | 3 | 3 | 2.9 | 2.8 | 2.7 | 10% | |
| WGH | SFD | e | 15,991 | 3 | 3 | 2.6 | 2.5 | 1.6 | 49% | |
| WHD | HGN | e | 3,627 | 2 | 2 | 1.4 | 1.0 | 1.0 | 50% | |
| WHN | HBY | d | 2,289 | 10 | 9 | 11.2 | 10.3 | 7.9 | 23% | |
| WHN | JAM | d | 5 | 98 | 96 | 91.4 | 91.0 | 87.2 | 11% | |
| WHN | SHN | d | 45 | 20 | 20 | 22.0 | 20.8 | 19.6 | 2% | |
| WHN | SPK | d | 2,642 | 9 | 7 | 8.9 | 6.7 | 5.1 | 44% | |
| WMR | CHT | e | 10,521 | 3 | 3 | 2.4 | 2.3 | 1.8 | 39% | |
| WMR | HWT | e | 10,989 | 2 | 2 | 1.8 | 1.5 | 1.3 | 36% | |
| WWD | JAM | e | 769 | 17 | 16 | 14.8 | 14.0 | 12.2 | 29% | |
| WWD | MVN | e | 5,421 | 2 | 2 | 2.4 | 2.2 | 1.5 | 23% | |
| WWD | SAB | e | 1,232 | 10 | 10 | 10.9 | 10.2 | 9.4 | 7% | |
| WWD | VSM | e | 1,782 | 6 | 5 | 6.0 | 5.3 | 4.9 | 19% | |
| WYD | DPK | e | 11,816 | 5 | 3 | 4.9 | 4.5 | 3.6 | 27% | |
| WYD | FMD | e | 7,459 | 6 | 4 | 6.1 | 5.6 | 4.6 | 23% | |
| WYD | JAM | e | 297 | 31 | 31 | 32.1 | 30.7 | 28.3 | 10% | |
| WYD | NYK | e | 210 | 58 | 58 | 57.3 | 55.5 | 50.4 | 13% | |
| WYD | PLN | e | 2,973 | 2 | 2 | 4.2 | 3.8 | 3.0 | 0% | |
| YPK | MFD | d | 1,456 | 8 | 8 | 7.4 | 7.2 | 6.4 | 19% | |
| YPK | RHD | d | 904 | 25 | 25 | 24.5 | 24.0 | 23.3 | 8% |
To illustrate just how much time schedule padding takes up on a normal trip, take a look at these two example trains before and after schedule padding. The first is a typical Ronkonkoma train (making stops all stops to Hicksville, then Jamaica, Woodside, and NY-Penn Station). These trains are typically scheduled for 1 hour, 20 minutes. The second is the dreaded Babylon local (making all stops to Rockville Centre, then Jamaica, Kew Gardens, Forest Hills, and NY-Penn Station). These trains are typically scheduled for 73-76 minutes, depending on what stops they make. Without schedule padding, both of these trips are possible to run in under an hour.
| Station | Current schedule | Without sched. padding | Station | Current schedule | Without sched. padding | |
|---|---|---|---|---|---|---|
| RON | --- | --- | BTA | --- | --- | |
| CI | 7 min | 4.5 min | LHT | 5 min | 4.6 min | |
| BWD | 4 min | 3.3 min | CPG | 3 min | 2.1 min | |
| DPK | 5 min | 2.9 min | AVL | 2 min | 1.7 min | |
| WYD | 5 min | 3.8 min | MPK | 3 min | 2.3 min | |
| FMD | 6 min | 4.6 min | MQA | 2 min | 1.5 min | |
| BPG | 5 min | 3.6 min | SFD | 2 min | 1.8 min | |
| HVL | 5 min | 3.3 min | WGH | 3 min | 1.9 min | |
| JAM | 23 min | 16.1 min | BMR | 3 min | 1.8 min | |
| WDD | 9 min | 7.5 min | MRK | 3 min | 1.9 min | |
| NYK | 11 min | 7.0 min | FPT | 3 min | 2.0 min | |
| BWN | 3 min | 1.9 min | ||||
| RVC | 3 min | 2.4 min | ||||
| JAM | 18 min | 12.9 min | ||||
| KGN | 4 min | 3.7 min | ||||
| FHL | 2 min | 1.7 min | ||||
| NYK | 16 min | 10.3 min | ||||
| Total | 80 min | 56 min | Total | 75 min | 54 min |
Explore the data: Average speeds and schedule padding
You can see the average speed, how much schedule padding current schedules have, and how running times have changed since 2010 for every LIRR train at this link.All of this schedule padding means that trains can operate well below the timetable speed limit for most, if not all, of their journey and still arrive at their final destination on time. Take the South Shore during the AM Peak, one of the worst examples of excessive schedule padding on the LIRR. An off-peak Babylon local making roughly 17 stops takes 74-76 minutes to make the trip from Babylon to New York. But during rush hour, despite trains making only a small handful of stops, trains only make that trip about 10 minutes faster than the milk run local. For example, the train I often take when I drive to Babylon—train 29, the 6:32a from Babylon—makes just three intermediate stops (Massapequa Park, Massapequa, and Seaford), which is 14 fewer stops than the local, yet it only makes the trip 10 minutes faster than the local.
Without schedule padding, this trip should be possible in about 42 minutes, yet it's scheduled for 65 minutes (more than 20 minutes of schedule padding). If you look at how fast this train actually travels compared to the timetable speed limit, you see where all of that goes. Despite the South Shore having a timetable speed of 80 mi/hr for practically its entire length, the train doesn't come anywhere close to running near MAS...instead, this "express" plods along between 30 mi/hr and 50 mi/hr for most of the trip, and it ran faster than 60 mi/hr for a total of just 7 seconds east of Jamaica...yet the train still arrived on time, thanks to schedule padding.
Interactive map: Observed speeds for example trains
Check out this map to see how fast some express trains actually go over the course of their trip. The map shows data for four example trains: two Seaford expresses on the South Shore, and two Hicksville expresses on the Main Line. There is one train in each direction: westbound trains are circle points, eastbound trains are diamond points. You can toggle the data for individual trains on and off using the check boxes along the left-hand pane.Speeds were measured using GPS, so are by no means exact, but are close. In order to live within Google's 2,000 data point limit, only the non-stop express segments are shown (from just outside the East River Tunnels to Seaford or Hicksville). The resolution is approximately one point per second, though some points were thinned to bring the total number of points to under 2,000.
Given the ubiquitous and significant schedule padding, the LIRR could make major travel time improvements simply by reducing the copious amounts of padding in the current schedules. And the best part about schedule padding reductions is all of these running times are achievable using the current equipment and infrastructure (and every time shown in the table above was done by at least 1% of trains)...therefore the railroad can deliver these travel time improvements without having to spend a cent on physical infrastructure. I don't have the hard data for Metro-North, but I suspect this is even moreso the case, as running times on MNR have crept up even faster in recent years as they undertake various infrastructure renewal projects across their system...
Now while we can and should expect much better timekeeping from LIRR and Metro-North, I would never suggest eliminating all schedule padding completely...some sort of cushion is needed to account for day-to-day variations in conditions and to prevent a single delay from rippling throughout the entire system for hours. BUT, an average of 28.4% is clearly excessive, and well beyond what is seen on peer systems elsewhere in the world (Swiss railways, for example, typically have around 7% schedule padding). Even reducing current schedule padding by half, to 14%, would deliver significant travel time improvements across the board. While still being twice what the Swiss need to keep trains on time, 14% schedule padding would allow for an increase in the systemwide average speed from 29.8 mi/hr to 35.5 mi/hr. Here's how end-to-end travel times would improve for some common trips:
| Train stopping pattern | Current travel time | 14% sched. padding | 0% sched. padding |
|---|---|---|---|
Babylon local
| 76 min | 63 min | 54 min |
Babylon express
| 64 min | 52 min | 46 min |
Port Washington local
| 46 min | 37 min | 32 min |
Port Washington express
| 37 min | 30 min | 26 min |
Oyster Bay (to/from JAM)
| 56 min | 47 min | 41 min |
Port Jefferson (to/from HUN)
| 48 min | 40 min | 35 min |
Hempstead local
| 53 min | 43 min | 38 min |
Long Beach
| 55 min | 45 min | 39 min |
West Hempstead shuttle
| 15 min | 12 min | 11 min |
Huntington local
| 66 min | 57 min | 50 min |
Ronkonkoma
| 82 min | 68 min | 59 min |
Montauk (to/from JAM)
| 170 min | 141 min | 124 min |
Far Rockaway local
| 55 min | 44 min | 38 min |
Interactive resource: How much faster could your commute be?
To give you an idea of how much faster your commute could be without schedule padding (or with a more reasonable amount of padding), you can plug your train and origin/destination information into this Excel tool to see how much time you might save. Download the Excel worksheet to your computer and enter information into the green boxes to see the results.I'll pause to stress again how important speed and travel time improvements are to overall operating efficiency. A lot of trips on today's schedules (particularly on the small branches) are right about an hour long: Hempstead, Long Beach, Far Rockaway, Oyster Bay, etc... Because running times are nearly an hour, hourly service requires at least three or four sets of equipment and crews, since a train can't run all the way there, turn around, and run back within 2 hours. But with less schedule padding, all of these trips can be done in 40-45 minutes, which means the railroad would only need two sets of equipment and crews to run hourly service—drastically improving efficiency and making it easier to add more service on these branches.
Organisation vor elektronik vor beton
There is a German saying that, when translated, goes something like "organization before electronics before concrete". This saying suggests that when faced with a problem, one should first try to find some sort of organizational improvement that can solve or mitigate the issue. If no such solution is available, turn to technology to see if that can provide a solution. If all else fails, resort to actual physical construction, but only as the last resort. The idea is that it is significantly easier and cheaper to find and implement an organizational solution to a problem than it is to build, expand, or otherwise modify a facility.
Along those lines, below is a summary of actions that LIRR and Metro-North could take to improve train speeds:
- Reduce schedule padding across the board, starting by cutting running times to be no more than 14% longer than the raw running time, then work downwards from there as it can be tolerated without adversely impacting reliability
- Clearly define the start and end locations of all speed limit changes with improved signage by installing wayside signs at all speed limit change locations, so train crews can be confident in knowing exactly where they need to slow or return to track speed. In cases where there is a significant change in the speed limit, install car markers so trains of different lengths can begin accelerating to track speed as soon as possible
- Utilize the implementation of Positive Train Control (PTC) to be the default enforcement mechanism for speed limits, and eliminate cases where the legacy signal system is used to artificially slow trains at speed restrictions (e.g. use the signal system to convey track occupancy information only, not speeds)
- Retrain train crews to encourage more aggressive train handling and operating closer to MAS whenever possible.
- With the added confidence PTC will bring to speed limit enforcement, reduce the safety factor/cushion on speed limits, allowing trains to operate closer to the design speed (including by seeking waivers to FRA regulations governing track speeds, if necessary and appropriate).
- Expedite the transition to Reduced Aspect Signalling (RAS), which is not limited to conveying only three or four speeds.
- Expand current EMU fleets with off-the-shelf, leightweight EMU's based on European designs that have much higher rates of acceleration, and expedite the replacement of the MTA's slower-accelerating pre-modern EMU fleets (M-7, M-8, M-9).
- Prioritize and expedite the expansion of electrification so that today's diesel trains can be replaced with faster accelerating EMU's.
- In areas where expansions of electrification is not feasible or appropriate, replace the current fleet of conventional locomotive-hauled trains with Diesel Multiple Units (DMU's) or HMU's, which accelerate faster and perform better than push-pull trains.
- Increase superelevation on key curves and use a larger cant deficiency to reduce the impact of curve-related speed restrictions.
- Upgrade power infrastructure to allow the existing EMU fleet to accelerate at their original design acceleration and avoid power draw problems
- Evaluate which sections of straight track could be worthwhile to upgrade to a higher track class to support higher top speeds (e.g. the Main Line from Woodside to Hicksville, the Montauk Branch to Wantagh, the Port Washington Branch to Great Neck).
A concerted effort to increase train speeds has many benefits. In addition to getting passengers from point A to point B faster (which everyone likes, and makes taking the train more competitive with driving), reduced running times also allow for more efficient operations, including more efficient manipulations of train crews and equipment, more logical and consistent service patterns, and more capacity and throughput overall. In many cases, railroads can deliver major running time improvements with little to no infrastructure work, either by reducing schedule padding or reducing the impact that the legacy signal systems or train crew behavior can have on operating speeds.
Railroads should set clear goals for delivering speed improvements by increasing average speeds. In a 1983 report by the Regional Plan Association and the Long Island Association, these regional groups recommended LIRR pursue ways to increase average speeds from 35 mi/hr to 40 mi/hr in electric territory. More than 36 years later, little progress has been made on this front. Today, just 2% of LIRR trains have an average speed of greater than 40 mi/hr, compared to 9% of Metro-North trains and 10% of NJTransit trains. Last year I wrote that pursuing 40 mi/hr average speeds systemwide should be a major priority for the 2020-2024 Capital Program—the largest in MTA history. The now-approved program includes unfortunately little scope to actually achieve this.
But such is the problem when the focus is more on finish and flash than the actual nuts and bolts of system modernization... When LIRR and Metro-North's peers elsewhere in the world were modernizing around the turn of this century, the focus was on exactly this kind of stuff: making operations as efficient and standardized as possible, signalling upgrades and grade separations, and a strict attention to detail to make sure trains run as fast and reliably as possible (enabling very frequent service on largely existing infrastructure), with schedule padding pared down to the bone. Not installing USB ports and fancy display screens which barely work...
I firmly believe that 40 mi/hr average speeds are within striking distance for both LIRR and Metro-North. The question is will they put in the effort and focus the attention required to make it happen?