Saturday, September 23, 2017

LIRR MDBF Growth Faltering

This item appeared first in News and Notes: September 23, 2017

Growth in the LIRR’s Mean Distance Between Failure (MDBF) metrics—the primary way the LIRR reports on train equipment reliability—has been one of the few bright spots in the LIRR’s performance statistics the last few years, but that upward trend seems to be slipping these last few months, as the LIRR’s fleet reliability is tracking about 5% lower through the first seven months of this year compared to the same period last year.

The LIRR met its fleet-wide 200,000 mile MDBF goal by the skin of its teeth in July, but have fallen below their goal three times so far in 2017 (in January, Mach, and May). Year-to-date through July the LIRR’s fleet-wide MDBF is 195,066 miles, or about 5,000 miles short of the goal.

While the reliability of the diesel locomotives is improving, reliability of the car fleets has slouched a bit over this period last year—the MDBF of the C-3’s are down about 16% over last year, and while the MDBF of the M-7 fleet has gone down only slightly compared to 2016, the LIRR’s newest railcars have seen their MDBF drop 28% over the same period in 2015.

The MDBF of the M-7 fleet has been fluctuating considerably from month to month. While the fleet had its second-highest MDBF ever just eight months ago in December 2016 (at 1,340,112 miles—only the second time the LIRR has broken the million mile mark for MDBF), in the months immediately before and after it hit that very high mark, the M-7 fleet failed to meet its MDBF goal by nearly 100,000 miles (340,568 miles and 349,014 miles in November 2016 and January 2017, respectively). The standard deviation of the M-7 fleet’s MDBF is nearly eight times as much as the other fleets (195,533 miles vs. 25,198 miles), suggesting it erratically bounces back and forth between having good months and bad months. The bad months seem to be outnumbering the good months this last year-and-a-half or so, leading to the 28% decline in MDBF compared to the same period in 2015.

2015 was a very good year for the LIRR’s fleet maintenance, and for the most part they have been struggling to live up to those marks since. The graph below shows 12-month rolling averages for the LIRR’s different fleets from 2000 to today (the solid lines). Fourth-order polynomial trendlines have been fitted to each fleet’s curve (the dotted lines) to show the overall trend of the fleet’s performance over the last fifteen or so years. The black line represents the LIRR’s overall MDBF:


When evaluated over this longer term, you can clearly see most of the trends slouching downwards after a peak around 2015. Only the C-3 fleet (the bright blue line) is showing any sort of marked improved over the last several years. Both the reliability of the M-3 and M-7 fleets (orange and pink lines) are trending downwards pretty significantly, and as a result, the LIRR’s overall fleet reliability is also trending downwards. (The DE and DM diesel locomotives have been consistently disappointing during their 20-year tenure on Long Island, their trendlines are effectively flat).

This graph also better shows the significant variance in the M-7 fleet’s reliability, jumping between spells of good months and bad months. The M-7’s have a much lower coefficient of determination compared to the overall fleet-wide MDBF (0.8185 vs. 0.9923).

Equipment failures are the second leading cause of controllable delays on the LIRR, with about 269 failures accounting for more than 1,322 delays through the first eight months of this year, so keeping the equipment well-maintained should be a top priority. The LIRR’s MDBF tends to be lower in the winter but otherwise doesn’t fluctuate much depending on the month of the year, so it’s not like MDBF typically rallies on its own in the last few months of the year. The railroad will have to take some sort of concerted action to reverse these downward trends; let’s hope that happens sooner rather than later.