As much as we might not like it, dozens upon dozens of LIRR trains are delayed each day. The LIRR is usually good enough, however, to let us know that the train we might be standing on the platform waiting for is running behind. The LIRR issues alerts for most trains that are operating 10 or more minutes late, cancelled, or partially cancelled. The alerts are sent out by e-mail or SMS text messages to those who sign up for them on the MTA’s website. All of the alerts are also shared to the LIRR’s Twitter feed. The alerts commonly include some sort of reason for the delay.
If you were to go up to a commuter on a train and ask them what they think is the most common reason for delay, chances are you’ll hear “equipment trouble”. In January, Fios1 asked LIRR commuters just that question—and many of them responded saying “equipment trouble”.
However, when one looks like the numbers the LIRR publishes each month, you’ll see a very different story. The number of delays due to “Maintenance of Equipment” is not the highest on the list (it averages 3rd or 4th out of 10 categories of delays). And the LIRR’s Mean Distance Between Failure numbers (at least for the electric fleet) are fairly high and regularly exceed the LIRR’s goal.
The LIRR’s monthly operating reports, included in the meeting notes for the MTA Board LIRR Committee Meeting consist mainly of numbers in tables, and there’s not much in terms of definitions for what all of those numbers mean.
I asked the LIRR to define what type of delay is counted as a delay due to “Maintenance of Equipment” in the monthly operating reports. This was their response from November:
“Delay caused by trouble with any mechanical part of an LIRR train. Some examples of equipment problems that can delay a train include propulsion issues whereby the train is unable to draw power, flat spots on wheels (which translate to a rough ride for customers and may require slowing down the train), door problems (won't open or close), radio communication problems (critical for the engineer and conductor to be able to communicate with dispatchers in our control center), brake trouble (brakes are designed to fail in the on position, meaning the train cannot proceed), horn problems (horns are required for grade crossing safety) to something as seemingly mundane as windshield wipers in the engineer's cab that aren't working, etc.”
I then asked the LIRR for their definition of what they consider a “Primary Failure” that are tallied in the MDBF reports each month. This was their response from March:
"A Primary Failure affecting the MDBF is a failure of the on-board equipment that causes a train to be delayed greater than 5 minutes and 59 seconds at its final destination."
Going off of those definitions, if a train is being delayed and the alert says the train is being delayed due to “equipment trouble”, one would think that that particular delay would count both as a “primary failure” as well as a delay that would fall under the “Maintenance of Equipment” category. If an alert says that a train is being delayed due to another train with equipment trouble, then it would also count under the “Maintenance of Equipment” category of delay, since trains that are delayed due to another train are counted in the same category of delay as the original train.
With these in mind, I went through all of the alerts that the LIRR issued in the month of February (well, Outlook and Excel did most of the work!) and tallied up how many trains were delayed due to “equipment trouble” as well as how many trains were delayed due to other trains with equipment trouble. The full table of all of the alerts the LIRR issued in the month of February that mentioned “equipment trouble” or “equipment problems”, as well as the train they were issued for and the time the alerts were sent, is included at the end of this document. The final tallies, as well as the equivalent numbers that the railroad reported, are shown in the table below:
In alerts sent in
February 2015
|
Reported in Monthly Operating Reports
| |
Primary Delays (train directly reported as being late due to equip. trouble) (=“Primary Failure”) |
171
(from passenger alerts)
|
36
(pg. 230 of this report)
|
Residual Delays (trains that were reported as being delayed due to another train that was delayed due to equip. trouble) |
153
(from passenger alerts)
| |
Total Delays (the sum of the number of primary and residual delays) (=“Maintenance of Equipment”) |
324
(171 + 153 = 324)
|
175
(pg. 73 of this report)
|
Now it’s been a while since I’ve taken first grade math, but 171 doesn’t equal 36—and it’s not even close.
So what’s the reason for such a significant difference between the number of times the LIRR tells passengers their train is being delayed due to “equipment problems” and the number of trains that are reported in the final board documents? Well, the railroad is either fudging the numbers that they are reporting in the board documents (by underreporting the number of primary failures (thus inflating the MDBF averages) and underreporting the number of trains delayed due to Maintenance of Equipment), or they’re not being honest with passengers regarding the real cause of their train’s delay.
Considering how little the railroad puts out in the form of raw information, it’s difficult to quantify which one is the drives the discrepancy the most. The LIRR does seem to care a lot about their performance indicators (OTP, MDBF, etc.), and there’s no clear definitions for what counts as what in the operating reports and no clear procedure for assigning the final category of delay when a train arrives late. Trains that are delayed by 10 minutes due to equipment trouble at Deer Park and then one minute due to loading a wheelchair passenger at Mineola could be either attributed to the Maintenance of Equipment category, or the “Public” category. While the total number of trains typically comes out to the right amount, there doesn’t seem to be all that much care given to how carefully the categories of delay are assigned. A large number of delays in the “Public” or “Miscellaneous” wouldn’t raise as many eyebrows as an unusually high number of delays in the Maintenance of Equipment category.
High Mean Distance Between Failure numbers also don’t tend to draw all that many questions from the powers at be—so whether it comes down to not counting more minor equipment problems (like a burnt out headlight, or whatever) as failures that negatively affect MDBF (which isn’t consistent with the LIRR’s definition of Primary Failure, which doesn’t make any exceptions for minor things), or just severely inflating the numbers, there’s likely some sort of discrepancy here. I don’t think there’s any equipment failure that could be considered “preventable”, since it almost always boils down to something that ought to have been designed or maintained better (if I had a convertible, I left the top down, and it rained, it’s my fault that the interior of the car is ruined, not the weather’s).
The source of the discrepancy can also come from the other end when the alerts are issued—when a train is timed at an interlocking as operating more than 10 minutes late, the railroad’s customer advisory system generates an alert, to which someone there assigns a reason, and then sends it out to everyone who’s subscribed (typically on the order of tens of thousands of people). The reasons for delay seem to be somewhat standardized with the alert writers picking from a series of pre-scripted reasons. If the discrepancy originated on the alerts end, it’s likely due to one of two different reasons.
The first might happen when the alert writer doesn’t know what caused the delay. Not knowing what the actual cause of the delay is, he or she just lies and says it is “equipment trouble” and sends it out to everyone. This speaks to how information can be slow-flowing internally, as trains can wind up being 10 or more minutes late someplace and there’s no clear reason known for it. Whether the information is not communicated by the train crew to the Movement Bureau, or whether it’s not passed along from the Movement Bureau to the alert writers. The other instance where this might happen is where the railroad knows the cause of the delay, but decides it’s something they don’t want to share with us. For the most part, it seems like “equipment trouble” is used as a giant catch-all, and if the railroad doesn’t want use to know why the train is really delayed (i.e. the crew didn’t show up for work), then they just lie and say it’s being delayed due to “equipment trouble.”
So whether the huge discrepancy is a result of the LIRR cooking the books to make their performance numbers look better, or a result of them flat out lying to their passengers in alerts about why their train’s delayed, there’s really no acceptable explanation for why there’s a 150 train discrepancy in the total value. The definitions the LIRR provided seem pretty clear-cut and straightforward, and fit well within what one would consider “equipment trouble.” Playing fast and loose with the truth is not the greatest way to please passengers—the railroad’s customers. If the train’s late because the engineer forgot to set an alarm and showed up to work late, then say so. It won’t make the delay any better…but at least passengers won’t be misled. And if the alert writers don’t know the reason for delay, don’t specify one. A lie of omission is slightly easier to stomach than a lie of commission, and an increasing number of reason-less alerts might compel them to streamline the flow of information on the internal side of things.
The full listing of alerts—10 pages in total—that mentioned “equipment trouble” in February is included at the end of this document and can also be viewed online here. Multiple alerts for the same train were marked with “D” and not counted, alerts that were a primary delay were marked “P”, trains that were delayed due to another trains with equipment problems were marked “R”. Daily totals and individual train totals are also available on the online spreadsheet. A very small number of trains that had alerts issued for them ended up arriving at their final destinations on-time (those trains were marked with “OK” and excluded). Also keep in mind that the listing isn’t complete, as alerts are only issued for trains that are more than 10 minutes late, and some trains don’t have alerts issued for them at all.