This post was published in 2014 and was a discussion on a series of concept timetables for East Side Access developed by The LIRR Today. The LIRR published a proposed service plan and draft timetables in 2022. Read about the proposed East Side Access service plan here.
This post will serve as the homepage for my collection of sample ESA Timetables. Below you will find links to the most recent uploads of each timetable (links will be activated the morning the post for that branch is published). You will also find a "revision history" containing brief descriptions of changes I have made to the schedules since I first uploaded them.
If all goes according to plan, when I update a timetable, the new updated version will automatically take the place of the previous version, so all old links will automatically go to the new schedules easily. If you have any questions or comments, you can leave a comment on the post that that timetable was introduced in (those links are also provided below).
Regional Rail Schedules:
Rural Rail Schedules:
| North Fork Line | (view post) (feedback & comments) |
| South Fork Line | (view post) (feedback & comments) |
City Rail Schedules:
| Atlantic Branch | (post coming soon!) |
| Bay Ridge Branch | (post coming soon!) |
| Belmont Park Branch | (view post) (feedback & comments) |
| Hell Gate Branch | (post coming soon!) |
| Lower Montauk Branch | (post coming soon!) |
| Main Line west of Jamaica | (post coming soon!) |
| Rockaway Beach Branch | (post coming soon!) |
| Willets Point Trains | (post coming soon!) |